Single Bucket 2 Ton Front Head Loader 1350mm Dump Reach

Brand Name:MCLLROY
Certification:CE,ISO9001
Model Number:MCL932 ZL932
Minimum Order Quantity:1 Set
Delivery Time:5-8 working days
Payment Terms:30% T / T in advance and 70% balance before shipment Or 100% L/C at sight
Contact Now

Add to Cart

Verified Supplier
Location: Guangzhou Guangdong China
Address: No.812, Nandidong road, Qiaonan street,Panyu district, Guangzhou city, Guangdong,China.
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Front Head Loader 2 Ton Wheel Loader 1350mm Dump Reach


1. Products Description

We need the construction machine to do heavy work, obviously it has to be efficient, take loader as an example, the bucket should shovel as much as possible, the loader should be stable while working, the control should be flexible and easy, the malfunction rate is low of course.


MCLLROY wheel Loader is a kind of front wheel loader with single bucket ,articulated and hydraulic unloading. It has been developed and designed in accordance with user requirements, reference models after absorption of domestic and overseas advanced similar structural features and advanced technology.


2. Specification

MODELMCL 932/ZL 932Metric Units
ENGINEEngine ModelYun Nei 490 Supercharged
RPM2400
Rated Power58 kW
EmissionsEU Stage II
WEIGHTSOperating Weight3670 kg
Rated Load1800 kg
BUCKETSBucket Capacities0.6-1.0 m³
TRANSMISSIONMax. Travel Speed28 km/h
Gear BoxCVT
265 torque converter
AlexSmall hub
Axle Base2210 mm
BrakeDisc Brake

3. Details and Advantages

The main components of the loader are used brand-name manufacturer's products, interchangeability of good, reliable, well-resourced parts.

1) Engine:Strong driven force ,low fuel consumption ,high economic benefits.

2) Transmission:Split torque converter,not high temperature,easy to repair.

3) Hydraulic system:Open hydraulic system,constant flow gear pump ,heat treatment gear,provide stable high pressure oil for wheel loader.

4) Tire:A variety of patterns to adapt to different perorations ,solid tires available.


4.Production lines:

A complete production process mainly includes: material procurement-steel plate cutting-welding-spray painting -drying-assembly-inspection


Spray painting:

Normally, the spray painting process includes hanging the parts, spraying primer or first layer coating, baking finish, spraying second layer coating, baking finish, drying in three different temperature.

The workers in charge of hanging will check if the part has dust and oil, anything that will affect painting, which will be removed.

There are two worker at Station 1 to do the painting on one side of the part.

Another 2 workers at Station 2 will paint the other side, and the third worker will check if there is any spot missing and repaint.

Next is our baking room and No. 1 to No. 3 drying machines.

Pick up station workers use forklift to transfer the finished parts to the part's corresponding storage place, which is usually next to the production line.

Some factories only hire one person to take care of the spray painting to cut the cost. It is hard to control the painting quality like that.

Our technicians in the painting process are supposed to control the painting flow rate just right, without over painting, and the thickness of each surface should be balanced. In the pick up Station, there are special personnel for quality inspection of painted parts. Similarly, our factory adopts report mechanism. Subsequent assembly or factory inspection inspector find that the spray painting is unqualified and they will report it.




2 ton loader
front head loader
front end loaders
hydraulic front loader
front hand loader

China Single Bucket 2 Ton Front Head Loader 1350mm Dump Reach supplier

Single Bucket 2 Ton Front Head Loader 1350mm Dump Reach

Inquiry Cart 0