High Speed Highway Guardrail Roll Forming Machine Delta PLC Control System

Brand Name:JCX
Certification:CE/ISO
Model Number:Highway Guardrail Roll Forming Machine
Minimum Order Quantity:1 set
Delivery Time:about 50 working days
Payment Terms:L/C, T/T, Western Union,
Contact Now

Add to Cart

Verified Supplier
Location: Shanghai Shanghai China
Address: Botou City, Beijing-Shanghai Expressway exit, Zhenggang Road (500 meters south of Botou Development Zone)
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

High Speed Cold Steel Two Peaks Three Waves Highway Guardrail Roll Forming Machine


1. Description Of Highway Guardrail Roll Forming Machine


We are a professional highway guardrail roll forming machine manufacturer, It’s also named Highway High speed guardrail Forming Machine,

highway guardrail roll forming machine steel production line high speed guard board making machine, manufacturer 2 waves high speed way safety guardrail road barrier highway guarding rail roll forming machine, High quality metal sheet bending machine highway guardrail roll forming machine, etc.


Our High Speed Cold Steel Two Peaks Three Waves Highway Guardrail Roll Forming Machine produce high quality w beam guardrail, one product machine can produce products of a wide rang of specifiations. highway 2 wave and 3 wave guardrail is the most popular.


If you have requirements for production speed, power, voltage and brand, please explain in advance.


2. Technical Details Of Highway Guardrail Roll Forming Machine


Machine Specifications
WeightAbout 15.5tons
SizeAbout 14.5M*0.8M*1.2M(length x width x height)
ColorMain color: bule or as your need
Warning color: yellow
Suitable Raw Material
MaterialGI PPGI GL PPGL
Thickness1.5-4mm
Yield Strength235Mpa
Main Technical Parameters
Quantity of forming rollers stations22
Diameter of forming rollers shafts110mm
Roll Forming Speed15m/min
Forming rollers material45# steel, coated with chromed treatment
Cutter materialCr12MOV, with quenched treatment
Controlling systemPLC
Electric Power requirementMain motor power: 22kw+22kw
Hydraulic unit motor power: 22kw
Electric voltageAccording to customer’s requirement

3. Main Components Of Highway Guardrail Roll Forming Machine


Manual Decoiler1 Set
Feeding Table1 Set
Roll Forming Unit1 Set
Post Cutting Unit1 Set
Hydraulic Station1 Set
PLC Control System1 Set
Reveiving Table1 Set

4. Production Flows Of Highway Guardrail Roll Forming Machine


Decoiler → feeding table (sheet metal is put by guiding platform) → main forming machine → Hydraulic cutting system → Receiving table



5. Advantages Of Our Highway Guardrail Roll Forming Machine


· More than 10 engineers and More than 10 designers with more than 10 years experience


· We have completed production system. And have high precious CNC grinders and milling machines,to make the rollers and shafts of the machine.


· Our machine's warranty period is 12 months and and we supply the technical support for the whole life of the equipment.


· We have professional engineer to check the quality of all parts. we do every step carefully to make sure the quality.

6. Application Of The Highway Guardrail Roll Forming Machine


This machine is widely used in the production of the metal roof sheets and wall panel. our machines are exported to many countries: Rwanda, Thailand, Philippines, Dubai, USA, South Africa, Peru, Russia, Saudi Arabia, Malaysia, Indonesia, etc.


7. Product photos Our Highway Guardrail Roll Forming Machine



8. FAQ


Q. What your company advantages?

A: 30% as the deposit by T/T in advance, 70% as the balance payment by T/T after your inspect the machine well and before delivery. Of course your payment terms are acceptable. After we get down payment, we will arrange production. About 30-45 days for delivery.


Q. I do not know about the machine and do not know how to install it. Can you install the machine in my factory?
If you need us to send engineers to your factory, you will pay for the travel expense such as visas, round tickets, hotels, and food Salary of 100USD per day per person (from departure from our factory, until we are back to our factory). You also need to take care of his safety.


Q. How can I start working?

The machine is tested well and the wires are connected.

When you get the machine in your factory, you just need to do following 3 things, and then you can start working.

a. Put the machine on the flat level ground.
b. Inject gear oil and hydraulic oil.
c. Connect 3 phase electric wire.

China High Speed Highway Guardrail Roll Forming Machine Delta PLC Control System supplier

High Speed Highway Guardrail Roll Forming Machine Delta PLC Control System

Inquiry Cart 0