

Add to Cart
Automatic 304 Stainless Steel Mesh Belt Rubber Batch Off Cooling
Machine
Applications
Automatic 304 Stainless Steel Mesh Belt Rubber Batch Off Cooling
Machine is the downstream auxiliary to the mixer or the dispersion
mixer. It is used for cooling, folding and depositing the rubber
sheet that comes from the open mills or twin screw extruder.
Mesh Belt Rubber Batch Off Cooling Machine is designed to perform
continuous operations of rubber slab conveying, separate applying,
air cooling, drying, cutting and wig-wag stacking.
Mesh Belt Rubber Batch Off Cooling Machine:
Model | XPG-600 | XPG-600 | XPG-800 | XPG-900 |
Type of Construction | Floor or Mesh-belt or Overhead Type | |||
Max. Rubber Sheet Width(mm) | 600 | 600 | 800 | 900 |
Rubber Thickness (mm) | 4-10 | 2-12 | 4-10 | 6-12 |
Temperature of Cooling Rubber Sheet Higher Than Room (℃) | 10 | 10 | 15 | 5 |
Friction Ratio (m/min) | 3-24 | 3-24 | 3-35 | 4-40 |
Cooling Fans Number(set) | Customer Request |
The Rubber Compound Film Air Cooling Batch Off Machine is a
commonly used cooling device in the production of rubber products.
The production of tires, cables, rubber hoses and other rubber
products is made much easier when the rubber sheets are cooled
using this equipment. It cools and dries the rubber sheet produced
in rubber mixing mills or rubber sheet presses so that they can be
properly stored.
Features of Rubber Compound Film Air Cooling Batch Off Machine
1. There are two structures types: Mesh-belt or overhead or floor-standing types.
2. The clients can choose high or low disposition according to the
practical requirements.
3. The high disposition batch-off line has hydraulic auto wig wag
section, which can battle the rubber strip tidily, the strip tidy
ratio (< =100mm);
4. There are three or five working positions for auto entering and
outputting of material tray.
5. Auto rubber collecting device; Auto cutter device; It has high
automation and can realize unattended operation.
FAQ:
1. Delivery time of the Batch Off Rubber Cooling Machine?
This is specially designed machine according to your specific
requirement.
From engineer designing to production completion, it needs about 35
to 45 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very
beginning to the end of production.
Every machine will be fully assembled and carefully tested before
shipment.
3. What's the machine quality guarantee?
Quality guarantee time is two year.We choose world famous brand
components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas?
How long time will it take?
Yes, we can supply overseas service and technical support but
customer needs to pay for the cost of the installation.
Small machine usually takes within 3~5 days.
Big plant usually takes about 30 days.
5.How can I trust you to deliver the right machine as I ordered?
We will absolutely deliver a good quality machine as we discussed
and confirmed in the order. At the same time, we regularly send the
production schedule and machine photos during the production
process.
The core of our company culture is innovation,quality,integrity and
efficiency. Also we have had many good cooperation with world
famous rubber production manufacturers. If you come to our factory,
we can show you're the user around us.
6.How can we go to your side?
We are located in Qingdao City, Shandong province, China. The name
of airport is Qingdao liuting airport. We will pick up you at the
airport.