Modular Operating Theater Design and Quick Installation One-stop Service

Brand Name:Amber
Certification:CE,ISO,GMP
Model Number:AM-OT011
Minimum Order Quantity:1 square meter
Delivery Time:25-30 days
Payment Terms:L/C, D/A, D/P, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Dongguan China
Address: No.60, Guancheng Area, Guanlong Road, Guancheng District, Dongguan City, China.
Supplier`s last login times: within 37 hours
Product Details Company Profile
Product Details

Modular Operating Theater uses modular assembly technique, where wall panels, ceilings, clean systems and equipment are prefabricated at factory site and assembled at the end of the equipment. The benefits include the reduction of the construction time, the decrease in pollution risks, as well as the ease of maintenance and subsequent upgrades.


The core advantages of Modular Operating Theater


  • Efficient construction: The installation period is shortened by 30%-50% compared with traditional structures.

  • Flexible expansion: The modular structure facilitates later transformation and functional adjustment.

  • Clean level compliance: Meets ISO Class 5~8 standards and adapts to different surgical needs.

  • Intelligent control system: Can integrate digital operating room management platform to improve operation and maintenance efficiency.

Standard steps for Modular Operating Theater installation


In order to ensure cleanliness and safety, the installation of modular operating rooms must follow a strict process:


1. Preliminary design and site survey


Customize the operating room layout, air conditioning system, air supply and exhaust path and equipment configuration plan according to the hospital's land use conditions, surgical types and clean level requirements.


2. Equipment selection and module prefabrication


Select high-quality clean equipment such as operating room operating lights, operating tables, FFU air supply units, air showers, etc., and complete the modular production of wall panels and ceiling systems in the factory.


3. On-site installation and clean commissioning


After transportation to the site, modular wall panels, ceilings and equipment are assembled according to the drawings, and finally the air volume balance and cleanliness test of the air conditioner are completed to ensure that the cleanliness level of the operating room meets the standards.


Cost and cycle of operating room construction


The cost to build an Operating Room can effectively control the budget and shorten the construction cycle due to factory prefabrication and standardized construction.


Usually, the construction cycle of a standard modular operating room is about 30-45 days, which saves more than 30% of time compared with traditional civil construction methods.


Ideal Operation Theatre is not merely an efficient as well as clean environment, it must also support the future development requirements of digital surgical management and intelligent interconnection of devices. With its one-stop service, Amber is capable of custom Digital Modular Operating Theatre solutions to customers, considering clean environment, integration of equipment and smart operation.


FAQ


Q1: What is a Digital Modular Operating Theater?

A: A Digital Modular Operating Theater is a prefabricated, cleanroom-standard surgical space designed for efficient installation and integrated with advanced digital control systems. It allows for flexible upgrades, real-time environmental monitoring, and centralized management of surgical equipment.


Q2: Can you provide a one-stop service including equipment supply?

A: We offer a one-stop solution covering design, prefabrication, on-site installation, commissioning, and supply of operating tables, surgical lights, FFU units, air showers, and other essential cleanroom equipment.



China Modular Operating Theater Design and Quick Installation One-stop Service supplier

Modular Operating Theater Design and Quick Installation One-stop Service

Inquiry Cart 0