Compared with first-generation technology(Heavy Structure technology) and second-generation technology (Light Structure technology). Modular Quick-install Operating Room has these features:
(1)Effectively shorten the period of construction: To finish construction of the same size operating room with 4 workers, by Heavy Structure technology, it will take 10 to 14 days, by Light Structure technology,4 to 8 days, while by Modular Quick -install technology, it will just take a single day.
(2)Simplify construction technology: Quick-install technology adopts the pre-manufacture method. and eliminates cross-construction of multi-work. Parts can be made at the same time during pre "manufacturing period.
(3)Effectively cut the cost of the project: By shortening the period of construction, project expenses will be effectively cut-down.
(1)Reduced Infection Risk: The unique sealing and the high level of air purification decrease the likelihood of catching airborne viruses.
(2)Enhanced Surgical Outcomes: The fact that great efforts have been made to regulate the environment will enhances the patients’ outcome through effective operating conditions.
(3)Efficient Workflows: Equipment integration eliminates redundant tasks and saves time which would otherwise be spent on setup and control of equipment.
(4)Comfortable Working Environment: Concerns of regulating temperatures and lighting have led to curbed fatigue among the medical staff hence improved efficiency.
(5)Flexibility: One may accommodate various types of surgeries and emergencies which increases the facility’s capacity.
Cleanliness | Available from class 100 to class 10000 |
Design Scope | 1. Structure: Wall Panel, Ceiling filtering system, Windows, Doors, Various Fittings, Flooring |
2. HVAC: AHU, Ducting, Piping, Chiller, dehumidifier, etc. | |
3. Electric: Lighting, Switch, Cables, Wires, Power Distribution Cabinet, etc | |
4. Auto-control: PLC Controller, Sensors for Humidity and Temperature, Control Pane | |
5. Medical Gas System: Medical gas terminal, medical gas pipeline | |
Temperature | 21-27℃ (or as per required) |
Humidity | 30-60℃ (or as per required) |
Application | Operation Theatre, Medical Center, ICU, etc. |
We adopt new type of laminated board, which we get patent in China, compared with old spraying board
material,the laminated board with advantage of,
Specification for OT room
PVC filmed steel wall panel 1. Anti-scratch 2. dust-proof and Antibacterial 3. quick assemble and movable 4. easy to clean 5. no fingerprint 6. Long work life, no color fade 7. Easy to install |
Laminar flow ceiling 1. Material: Electrolytic plate, cold plate spray, stainless steel
production. 2. Size: according to cleanliness request.100-10000 class. 3. Technics: Paint electrolytic steel plate,Polymer coated
electrolytic steel plate. |
Medical cabinet 1. Material : Stainless steel SUS304 2. Include 3 cabinet : Medicine Cabinet, Medical Instrument Cabinet, Medical Anesthesia Cabinet. 3. Size : 900*1700*350 or customized 4. Surface treatment : anti-static |