20#219*10 High Pressure Seamless Steel Tube / Fluid Delivery Tube ISO9001

Certification:BV, SGS, ABS,
Minimum Order Quantity:1TONS
Delivery Time:7-5 working days
Payment Terms:T/T, L/C
Place of Origin:China
Price:USD600-1500/TONS
Contact Now

Add to Cart

Verified Supplier
Location: Changsha China
Address: Rooms 2408,2409,2410, Huakun Building, No.200 Section 2 Xiangfu East Road, Dongjing Street, Yuhua District, Changsha, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

20#219*10 Fluid Delivery Tube High Pressure Steel Boiler Tube


Product Description: Boiler tubes refer to steel products that are open at both ends and have a hollow section. The ratio of its length to the surrounding area is large. According to the production method, it can be divided into seamless steel tubes and welded steel tubes. Wall thickness indicates a wide range of sizes, from capillary tubes with very small diameters to large-bore tubes up to several meters in diameter.


Type
Seamless
Size
Outer Dia:21.3mm-660mm,According to customer requirements
Wall Thickness:0.5mm-20mm,According to customer requirements
Length:1-12m,According to customer requirements
Certification
ce,ISO9001,etc
Standard
GB12771-91, ASTM A1053/A1053M-06, ASTM A268/A268M-05A, ASTM A269-07,etc
ASTM A270-03A, ASTM A312/A312M-06, ASTM A358/A358M-05, ASTM A632-04,etc
ASTM A789/A789M-05b, ASTM A790/A790M-05b, ASTM A872/A872M-07A,etc
Material
10#,20#,45#,Q235,Q345,Q195,Q215,Q345C,Q345A,etc
Application
Medical equipment,Table wares,Construction,Kitchen utensils,Chemical industry,etc
Main Features
1.Environmental protection: can effectively reduce environmental pollution.
2.Corrosion resistance: Strong anti-fouling, acid, corrosion, wear resistance, non-radioactive.
3.Surface cleanliness: The product surface is smooth and compact, not easy to be polluted by dust, and has good self-cleanliness.
4.Easy Maintenance: A slight loss is easy to repair,etc
Section Shape
Round
Alloy Or Not
Non-Alloy
Processing Service
Welding, Punching, Cutting, Bending, Decoiling
Technique
Cold Rolled Hot Rolled
MOQ
1 TON
Payment Terms
T/T, D/A, D/P, L/C, Western Union, MoneyGram,According to customer requirements
Delivery Time
Within 7 days, According to the quantity ordered by the customer.
Packing
Standard Seaworthy Package,according to customer requirements
Samples
Available

China 20#219*10 High Pressure Seamless Steel Tube / Fluid Delivery Tube ISO9001 supplier

20#219*10 High Pressure Seamless Steel Tube / Fluid Delivery Tube ISO9001

Inquiry Cart 0