Introduction:
High density polyethylene(HDPE) smooth geomembrane, made of virgin
resin by special production, has even and smooth surface on both
sides. It is especially designed for flexible geomembrane.
Specification:
Thickness ranges from 0.2mm to 2.0mm, width from 1m to 8m. The roll
length can be made according to design or customer request.
Property:
HDPE smooth geomembrane has excellent chemical and mechanical
property, anti-crack property, dimensional stability and anti-aging
property, furthermore it can be exposed for anti-UV property.
Application:
1. Environmental Protection and sanitation: such as landfill,
sewage treatment plant, power plant regulation pool, industrial and
hospital solid waste, etc;
2. Water conservancy projects: such as seepage prevention,
plugging, reinforcement, Canal seepage prevention, vertical core
wall, slope protection, etc. of Rivers and Lakes reservoir dams;
3. Municipal Engineering: Subway, building underground engineering,
planted roof, roof garden, sewage pipe anti-seepage;
4. Petrochemical: chemical plant, refinery, oil storage tank
anti-seepage, chemical reaction tank, sedimentation tank lining,
secondary lining, etc;
5. Agriculture: Reservoir, drinking water pool, storage pond, waste
residue treatment field, and anti-seepage of irrigation system; 6.
Aquaculture industry: intensive, factory breeding pond, fish pond,
shrimp pond lining, sea water circle slope protection, etc;
7. Salt industry: Salt Field crystallization pool, halogen pool
cover, Salt film, salt pool plastic film
Construction Method
1. The slope shall be laid in order from top to bottom. Don't pull
it too tight.
2. Tow adjacent longitudinal joints should not be in a horizontal
line, should bestaggered more than 1m each other.
3. Longitudinal joints should be more than 1.50m away from the dam
foot and bending foot, and should be located on the plane.
4. When the slope is laid, the direction of spreading film should
be basically parallel to the slope line.
5. The construction, first of all to use small diameter sand or
clay levelingbase, and then laid the geomembrane. The geomembrane
should not be stretched too tight, and the part of the soil bured
at both ends is corrugated. A transitional layer of about 10cm is
laid on the geomembrane with sand or clay.
FAQ
1.Are you manufacturer or trade company?
We Zhonglu are a professional geosynthetic products manufacture, we
will provide you with top-class service.
2. What's the order process?
a.Inquiry--- The more detailed information you provide, the more
accurate product we could provide you.
b. Quotation---Resonable quotation with clear specifications.
c. Sample confirmation---Sample could be sent before the final
ordering.
d. T/T 30% in advanced, and the balance could be paid before
shipment.
e. Production---Mass production.
f. Shipping--- By sea, air or courier. Detailed picture of package
could be provided.
3. How long is your delivery time?
Generally it is 3-5 days if the goods are in stock. or it is 5-7
days if the goods are not in stock, it is according to quantity.
4. How does your factory do regarding quality control?
"Quality is priority." We always attach great importance to quality
controlling from the beginning to the end.
5.What's the payment method you accept?
T/T, L/C,D/P etc.
Professional geosynthetics manufacturer
Anhui Zhonglu Engineer Materials Co., Ltd
Angela:86-18095658976