ODM De Watering Bags Geotubes For Erosion Control

Brand Name:OEM
Certification:ISO,SGS
Model Number:geotube
Minimum Order Quantity:1PCS
Delivery Time:5-8 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Hefei Anhui China
Address: 2-3C, Innovation And Entrepreneurship Park, Hefei, Anhui, China
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

High-Quality Geotube That Can Be Used for Tailings Slag Treatment


Product Description


Geotube is made from high strength polypropylene bag, can also use woven cloth material, choose the product material according to the project actual demand; Common black; Adjusted according to different specifications of products commonly used material 400 gsm; Unlimited length, the width can be multiple image splicing unlimited width, but directly affect the dehydration tube bag material intensity range is wider requirements material strength is higher; Basic order fill height for two-thirds of the diameter of the tube bag; According to the construction site of the grouting machine diameter custom, can according to actual situation or adding medicament (increased solidification speed accelerate spate separation).


ItemUnitTesting StandardTechnical Parameters
GT70X95BGT70X95
Breaking strengthMDKN/mISO 10319-20158585
CDKN/mISO 10319-2015105115
Elongation of breakMD%ISO 10319-20151313
CD%ISO 10319-201588
Sewing Tensile StrengthKN/mISO 10321-20087090
Static Bursting Strength(CBR)KNGB/T 14800-201089
Equivalent hole size(O90)mmGB/T 14799-20050.50.45
Permeability(Q50)L/m2/sGB/T 15789-20055035
UV-resistance (500 Hours strength retention)%ASTMD4355-20149090


This knowledge technology have a three-step process:

Step 1: Filling -- Sludge (dredged material) is pumped into the Geotube container. Environmentally-safe polymers are added to the sludge, which makes the solids bind together and water separate. The TenCate Geotube?container's unique fabric confines the fine grains of the material.

Step 2: Dewatering -- Clear effluent water simply drains from the Geotube container through the small pores in the specially engineered textile. This results in effective dewatering and efficient volume reduction of the contained materials. And this volume reduction allows for the repeated filling of the Geotube container. Over 99% of solids are captured, and clear filtrate can be collected and recirculated through the system. The decanted water is often of a quality that can be reused/returned for processing or returned to native waterways without additional treatment.

Step 3: Consolidation -- After the final cycle of filling and dewatering, the solids remain in the bag and continue to densify due to desiccation as residual water vapor escapes through the fabric. Volume reduction can be as high as 90 percent. When full, the Geotube container and contents can be deposited at a landfill, remain on-site, or the solids can be removed and land-applied when appropriate.


China ODM De Watering Bags Geotubes For Erosion Control supplier

ODM De Watering Bags Geotubes For Erosion Control

Inquiry Cart 0