Prefab Steel Structure Warehouse Building Metal Frame Construction

Brand Name:GST
Certification:ISO 9001, CE certificate of quality system
Model Number:Steel Structure Warehouse
Minimum Order Quantity:800 square meter
Delivery Time:30-45 work days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Site Member
Location: Qingdao China
Address: No.702 Shanhe road, Chenyang district, Qingdao City, China.
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

Prefab Steel Structure Warehouse Industry Frame Building Metal Construction

The Introduction of This Steel Structure Warehouse Building

Designed according to the customer's requirements, the fish storage room needs to be protected from light, so there are no windows and lighting strips.


At the same time, in order to solve the ventilation problem, we set up ventilators on the roof.


Classic Ventilator Advantages


--No electricity, 24/7 operation, zero operating costs, saving resources.

--High sensitivity, no noise, rainproof, sturdy and durable.

--Parts can be replaced by customers, easy to install and easy to maintain.

--The appearance is compact and elegant.

Sliding doors on the gable walls on both sides facilitate cargo transportation.

Double slope single ridge


--The roof slope is 10%, and the outer gutter + φ110UPVC forms a roof drainage system, which can cope with the rainy season

--There is a canopy above each door to play the role of sunshade and rain shelter.



The Details of This Steel Structure Workshop Building


site condition

Project locationwind load (m/s)function


Saudi Arabia

20-60km/hFish Warehouse


size

length (M)width (M)height (M)


60

302.6


crane request

crane tons (T)lifting height (M)crane quantity (set)


No

NoNo


wall request

brick wall height (M)insulationgutter


1.2m

YesYes


roof request

insulationskylightventilation


Yes

NoYes


door & window

the quantity and size of door (M)the size of lower window (M)the size of upper window (M)


4m*3m Sliding Door *2

NoNo


Advantages of steel construction

Prefab steel Structure workshop buildings are used for industrial production in which all steel structures are painted and then delivered to the project site for installation.

And because the steel structure can be manufactured in the factory and installed on-site, the construction time is significantly reduced.

Due to the steel it can dramatically reduce construction waste and is more environmentally friendly. Therefore, it widely used in industrial buildings and civil buildings.

Our company


QINGDAO GUSITE CONSTRUCTION TECHNOLOGY CO., LTD-The headquarter is located in the beautiful coastal city - Qingdao, China.The city where we are located has Qingdao port with a fully automated terminal, which is convenient for the sea transportation of goods.

Our factory has multiple production lines, equipped with steel cutting, shot blasting, stamping, bending, welding, forming equipment. The technology and equipment are advanced, and the steel structure is of good quality and durable.


Possess the foreign contracted project management qualification certificate issued by the Ministry of Commerce of China, CE certification [EN1090 certificate], IS09001 certificate, etc.



Production Capacity

The company has:


2 composite board production lines


more than 1 million meters/year

5 color steel plate production lines


2 million meters/year

2 H-type steel CNC production lines


20000 tons/year

1 C-type steel production line


2500 tons/year

1 Z-steel production line


2,000 tons/year


China Prefab Steel Structure Warehouse Building Metal Frame Construction supplier

Prefab Steel Structure Warehouse Building Metal Frame Construction

Inquiry Cart 0