

Add to Cart
Automatic C&Z&U channel t bar angle omega c u z stud truss furring c u z z purlin roll forming machine
1. High Precision And Speed
2. CE,ISO certification
3. Customization Accept
Manual decoiler | 1).Material coil inner diameter: 450mm-550mm 2).Max coil width:300mm 3).Carrying capacity: 1.5T |
Forming device | 1)Shaft material:high grade No.45 steel after treatment 2) Out diameter: 50 mm 3)Roller material: Cr12 polished and coated with chrome HRC55-60° 4)Forming speed:30m/min 5)Main motor power:5.5 kw 6)Roller station:10-12stations 7)Voltage:380v,50Hz,3 phase 8)Main frame structure: memorial arch structure 9)Control device:automatic cumputer control ,by PLC,operate easily 10)Cutting device: hydraulic tracking cutting(you can also request to add a servomotor,the production speed can be reached 40-60m/min) 11)Transmission: gear drive |
Hydraulic cutter | 1). material of blade: Cr12 mould steel with quenched treatment 55-60°C 2). cutting system: adopt advanced hydraulic drive, after forming automatic cut, no distort, no wasting , high safe factor.(main motor stop cutting) |
Control system | Type: PLC Frequency Control System with touch screen Length Error: ±2mm (about the electrical apparatus element ,customers also can specify the brand) |
Outpur table | It is simple and used to load finished product. Length:6m |
Features & Purposes:
Z-type steel machine strengthens its firmness with an arch type, stabilizes its operation
with gearbox drive, and improves product quality by adopting molding shearing to avoid
port deformations.Products are widely applied in purline set-up of steel-structure houses.
Profile, layout & production flow:
Steel thickness (t): from 1,5 mm to (at least) 3,0 mm;
Profile height (A): as following list
Flange width (B): as following list
Lip width (C): as following list
Minimum finished product length: at least 500 mm;
Maximum finished product length: at least 12000 mm;
Length tolerance: ±1.5mm per each pieces
Coiler loading → feeding-in with guiding (metal sheet is guided
into the first forming station) → straighten → rolling & forming →
hydraulic cutting → stacker running out
FAQ
Q1. What's your delivery time?
A1: Depending on the type of machine, duration of 1.25 days to 60
days from the date of order.
Q2. Do you have after-sales support?
A2: Yes, we are happy to give advice and we also have skilled
technicians available across the world.We need your machines running in order to keep your business running.
Q3. Do you sell only standard machines?
A3: No, most of our machines are built according to customers
specifications,using top brand components.
Q4. What will you do if the machine is broken?
A4: Our machine's warranty period is 12months,if the broken parts
can't repair,we can send the new parts replace the broken parts freely,but you need pay the express cost
yourself.If it is beyond the warranty period,we can negotiate to solve the problem,and we supply the technical
support for the whole life of the equipment.
Q5. Can you be responsible for transport?
A5: Yes,please tell me the destination port or address.we have rich
experience in transporting.
Q6. How to visit your company?
A6: 1) Fly to Beijing airport, By high speed train From Beijing Nan
to Cangzhou Xi (1 hour).
2) Fly to Shanghai Airport: By high speed train From Shanghai
Hongqiao to Cangzhou Xi(4.5 hours), then we can pick up you.
Our Services
Purlin use automatic metal steel track c u shaped steel roll forming machine
1. Our gurantee pieod is 12month after shipping the line.
2. We will send engineer abroad if the customer required for training and installation.
3. We'll here for replying you for 24hours, our service number is +86-18951563725
Machine Picture: