HS-3303 Three-Phase Portable Energy Meter Test Equipment (5mA~120A Current Output)

Brand Name:SHENGDI TECHNOLOGY
Certification:SGS,CNAS
Model Number:HS3303
Minimum Order Quantity:1 set
Delivery Time:30days
Payment Terms:T/T.L/C
Contact Now

Add to Cart

Active Member
Address: #8,Zhenghua Road,Wuyuan Industry Zone,Haiyan County
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details
  • HS-3303B Three Phase Portable Energy Meter Test Bench

HS-3303 serial products are small-sized, light-weight three-phase equipment; they adopt SPWM power amplifier technology, equip with high accuracy digital reference standard meter, MSPT etc., to operate high precise energy error calibration.

HS-3303 serial products also equip with PC control software and offer whole solution scheme for energy meter automatic calibration, also can supply DLL for second research; greatly improve user’s control and manager ability to equipment.


1.Based on A/D and DSP technology

2.Use DDS and SPWM technology

3.Equip with smart system control technology and CPU

4.Precise error processing technology

5.SPWM power amplifier, huge content, high performance, and low consumption, automatic alarm

6.Each station has an error processor, anti-high electric power

7.Modules design, easy to install and debug Automatically finish testing according to scheme through one-click

8.Aluminum frame, beautiful and strong

9.Customized according to the customers’ requirements

10.Small-sized, light-weight, and big output power

11.Flexible operation, can control each output factor fast


Item0.050.1
Accuracy

HS-5300 0.05/

TC-3000D 0.05(embedded)

HS-5300 0.1/

TC-3000D 0.1(embedded)

Rangevoltage(phase):20~300V(40-600V optional) current(phase):5mA~120A
Phase0~360°,resolution:0.01°(each phase can adjust separately)
F45~65Hz, resolution:0.01Hz
THDvoltage,current<0.5%(linear load)
Power stability

<0.05%/120 s

<0.1%/120 s

Output content

voltage(each phase):50VA current(each phase):100VA(100A)

Load characteristicresistive,inductive,capacitive(less than 1uF/each station)
Starting up currentMin. 2mA, accuracy:5%, starting up power: accuracy 5%
Pulse input≤1kHz
COM. testRS485/232/ IR/ carrier, support DL/T645-1997/2007,IEC1107
Tested meter1~3
Working conditionsTemp.:20℃±5℃; Humidity:<85% R.H.
Input power

AC220±10%,50/60Hz,(AC120V optional);Max. consumption:500VA


ModelNameApplication
HS-3303three-phase energy meter portable equipmentcommissioning,maintenance,development
HS-3303Bthree-phase energy meter movable equipmentdevelopment,calibration

Item

HS-3303

HS-3303B

Basic functionsbasic error
creeping test
starting up test
standard deviation
constants test
dial error
influence test
othersdaily timing error ☆
GPS ☆
COM. test ☆


China HS-3303 Three-Phase Portable Energy Meter Test Equipment (5mA~120A Current Output) supplier

HS-3303 Three-Phase Portable Energy Meter Test Equipment (5mA~120A Current Output)

Inquiry Cart 0