Multifunctional Computerised Low Pressure Foaming Machine Line Automatic 200L / min
Main Specification
Oven Length | 18m | Inner Conveyer length | 18m |
Foaming Height | 1.0-1.25m | Side Borar Adjustable Width | 0.98-2.3m |
Foaming Width | 1.0-2.25m | Conveyer Belt Speed | 0-8m/min |
Foaming Density | 8-100kg/m3 | Fall Plate | Six section adjustable |
Total Power | 130KW | Total output | 100-300kg/min |
(1)Main technique specification:
1, Dimension:Total length 33m×Total width 4m×Total Height 3m,Roller
( 3 m)
2, Foaming material Group: 13 groups, man-machine interface,
automatically computer control
3, Foaming width: 980mm~2250mm
4, Foaming height: Max 1200mm
5, Foaming density: 8Kg/m³~100kg/m³
6, Foaming speed: 2000r/min~7000r/min
7, Max total output:300kg/min
8, Material spraying way:
① The way of down sprayer head (upper, down, front, back can be
adjusted)
② the way of trough overflow pipe.
9, Controlling way of foaming:
① PLC controlling, can continuously foaming two different formulas
in one time
② All inverter controlling foaming and work in phase with the
production line
③ Oven declining board height and width can be adjusted by control
box.
④ Oven side links width can be adjusted by control box.
10, Mixing –head motor: 37kw
(2)Transducer Types
Model | Power/kw | Use | Qty | Brand |
G120 | 37 | Mixing head | 1 | Siemens |
G120 | 7.5 | POP, CaCo3 | 2 | Siemens |
G120 | 5.5 | PPG, | 1 | Siemens |
G120 | 4 | TDI, Flame retardant | 2 | Siemens |
G120 | 2.2 | MC, color | 2 | Siemens |
G120 | 1.5 | Water, Ann, Si, Tin, Color Anti-yellow etc | 7 | Siemens |
G120 | 0.75 | Spray head | 1 | Siemens |
VFD-B | 5.5/3.7/1.5 | Oven inner conveyer line,side conveyer line, cutting machine | 3 | Delta |
Marks: | ||||||
1. According to seller's standard designed drawing diagrame to arrange the production and inspection. | ||||||
2. if customer reqiure, techincians will be sent by seller, and the turn-round tickets fee, vise fee, $40 per day of allowance fee and hotel accommodation are in charge of buyer. | ||||||
3. Payments Terms: T/T 30% advance before production.the balance of total amount 70% will be paid before shipment. | ||||||
4. Delivery forms: Send to ShenZhen Seaport | ||||||
5. Spare parts: Offer assorted maintain tools. | ||||||
6. Package: paper & film package. | ||||||
7. Voltage: all the eqiupments are: 380V, 50HZ, 3P.(Voltage can be changed, but price need to increase 3%) | ||||||
8. Delivery date: 45 days (after seller get the advance). | ||||||
9. All the machines maintain for one year, if the damages caused by machine itself, excluding the man-made accidents, the broken parts offered by seller in free of charge, but the transport cost for buyer's account. |
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer
help to install the machine you must send someone to help about 30
days installation will finished. After that one electrician and one
foaming engineer will come to connecting the cable and run the
machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to
pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the
testing?
A: We will send you a list for the tools that you need to prepare
for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in
our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your
factory but you need to discuss the salary and all details with
him.