

Add to Cart
Automatic Polyurethane Foam Making Machine PU Foaming Machine High Pressure
Specification
This machine is mostly used to produce large-scale continuously
foaming production (density is about 6 to 100 kg/m3 ) . It adopts
the advanced touch screen and PLC Operation System , its
automatization level is high , the production is low-cost and the
quality fo foam is outstanding .
It is the most ideal equipment for large-scale foaming produce .
Man-machine interface , non-stop the machine can change formulas ,
it can produce the British elevation high-slow rebound , electronic
cotton , brassieres cotton , polyester cotton , yellow-resistant up
to 3-5 level , add powder 10 to 200 parts , the lowset density
6-100 , it also can produce on machine .
Main technique specification:
Dimension | Total length 35m×Total width 4m×Total Height 3m |
Foaming material Group | 13 groups, man-machine interface, both manual and automatically computer control |
Foaming width | 980mm~2250mm |
Foaming height | Max 1200mm |
Foaming density | 8Kg/m³~100kg/m³ |
Foaming speed | 2000r/min~7000r/min |
Max total output | 300kg/min |
Material spraying way | ① The way of down sprayer head (upper, down, front, back can be adjusted) ② the way of trough overflow pipe. |
Controlling way of foaming | ①PLC controlling, can continuously foaming two different formulas
in one time |
Mixing –head motor | 37kw |
Total power | About 90kw |
How is the packing of the machine?
The entire machine will be nude packing. Some of the parts will be
pack in wooden case. Others will be simple pack with paper or foam
sheet with plastic film.
How many container will be needed for the whole set of machine?
For the standard 13 groups of Automatic continous foam machine
Total three containers is enough 2*40HQ+1*20GP. In order to save
the place and the cost of delivery we will also put some parts that
inside the raw material tank.
We will try the best way to pack all the machine well and also save
the freight cost.
1.We will help to design the layout of the machine that put in your
factory.
2.We will send 2-4 experience engineers to install and testing the
machines.
3.We will teach your engineer how to operate the machine and how to
maintain the machines.
4.We will give you the machine operation manual and the best
formulation for target products that you are going to make.
5.We will help to buy the best raw material for making the foam if
you needed.
FAQ:
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer
help to install the machine you must send someone to help about 30
days installation will finished. After that one electrician and one
foaming engineer will come to connecting the cable and run the
machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD40 one day for one engineer and also need to
pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the
testing?
A: We will send you a list for the tools that you need to prepare
for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in
our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your
factory but you need to discuss the salary and all details with
him.
Q:During the foaming if we have some problems abt the foam and the
machine how can we do ?
A: You can just call our after sale manager explain for the
situation or send some picture we will help to handle within
24hours.
Q: During the using of the products if we find some problem how can
we slove?
A: You can just help to check in the operation manual and the video
first if can’t work just call our after sale service.
Q: How many spare parts for you to give us?
A: We will send you all the necessary spare parts that free of
charge together with the machine. After that you need to buy.
The main part of the machine