The gap that needs to be crossed is too large to use single span structure for economic crossing

Brand Name:Great Wall
Certification:ISO,CE,SGS
Minimum Order Quantity:1 Set
Delivery Time:Depending on the order
Payment Terms:TT Or LC
Place of Origin:China
Contact Now

Add to Cart

Active Member
Location: Zhenjiang Jiangsu China
Address: NO. 103, Nanxu Road, Zhenjiang,Jiangsu,China
Supplier`s last login times: within 16 hours
Product Details Company Profile
Product Details

When a gap to be bridged is too wide to be economically crossed by a single span structure, it is necessary to provide intermediate piers and install a multi-span bridge.
The positioning of intermediate piers is often dictated by the local geology and topography of the site. Otherwise, the positioning and quantity of piers depends upon the most economic balance between the cost of the piers and the cost of the bridge construction appropriate to the varying span lengths.
It is a design feature of CB200 Bridging that in addition to simple spans, it may also be erected to form multi-span structures. This can be done in two ways; either with continuous bridge trusses supported or as a series of broken-spans linked at each intermediate pier by span junction equipment. It should be noted that both of these options provide a continuous road deck for the traffic.
Mutispan Bailey Bridge
China The gap that needs to be crossed is too large to use single span structure for economic crossing supplier

The gap that needs to be crossed is too large to use single span structure for economic crossing

Inquiry Cart 0