Home /Boiler Parts /

Heating Element 98mm Boiler Manifold Headers For Coal Fired Plant

Heating Element 98mm Boiler Manifold Headers For Coal Fired Plant

Brand Name:HD Boiler
Certification:ISO9001 , SGS , TUV , ASME , EN
Model Number:Ultra - supercritical
Minimum Order Quantity:1 Set / Sets 10tons
Delivery Time:50 Days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details
Big volume heating element Boiler Header Manifolds For Coal Fired Plant
Product Description

Advanced and reasonable design

WNS series steam boiler adopts the most sophisticated three returns all wet back structure,thread smoke tube structure weld joint with high quality.

A large combustion chamber which increases the radistion heating furnace

Reasonable boiler combustor design, suitable for different fuels such as diesel, natural gas, town gas and mazout, the fuels can burn completely and increasing the radiation heating furnace area,reducing the NOX emissions.

High thermal efficiency

100% corrugated furnace and spirally corrugated tube, can absorb flame heat effectively, thermal efficiency can be more than 96%.

High welding quality

Main boiler welding joint are heat treated to remove the stress ensures the welding quality. Automatic welding facilities guarantee the 100% passing rate of flaw detection.


1Headers form an important part of all types of boilers.
2Steam from the generating tubes is collected in headers which are therefore always under pressure.
3This pressure may vary from 300 psi to 2000 psi. Since headers are always under pressure, the utmost care is taken by us while fabricating them.
4Depending on the generating capacity of the boiler the header sizes fabricated by us vary from 100 mm to 600 mm NB. The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the header.

1In manufacturing, the key of end cover hinder is welding.
2Since by manual arc welding, the weld joint is single-side welding without quality guarantee at the ends.
3In addition, due to large welding workload, frequent return for repair and long working period, it became the throat process of the whole hinder production.
4When making hinders of the style, we adopt advanced production technique, complete large equipment and mature technology, especially automatic submerged arc welding between hinders and end covers.

Details


1The necking hinders of the Company are made by hot press and retracting of seamless steel pipes at special hinder necking machine.
2In this way, the hinders will have thicker walls and cleaner surface. The necking cover will form membrane stress rather than bending stress with desired stress performance under the effect of inner pressure.

Features


1Strength calculation report with applied materials information.
2100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4Hydraulic test report: ensure the standard working pressure and safety.
5Excellent in welding quality, highly automatic, safe and reliable.


Classification



MaterialCarbon steel,Alloy steel,Stainless steel.
LengthAccording to costumes requirements.
Temperature Range300℃~1500℃
Diameter(OD)76mm~914mm
China Heating Element 98mm Boiler Manifold Headers For Coal Fired Plant supplier

Heating Element 98mm Boiler Manifold Headers For Coal Fired Plant

Inquiry Cart 0