A335 P9 / SA 335 P22 ASTM Standard Power Plant Economizer 6 Inches Diameter Sprial Welding

Brand Name:HD BOILER
Certification:ISO9001 , SGS , TUV , ASME , EN
Model Number:Sprial fins economizer
Minimum Order Quantity:1 Set / Sets 10tons
Delivery Time:60 days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

A335 P9 / SA 335 P22 ASTM Standard Power Plant Economizer 6 Inches Diameter Sprial Welding


Introduction


• Boiler economizers are heat exchange devices with finned tubes that heat a liquid, sometimes water, up to however sometimes doesn't exceed the boiling purpose of liquid.


• We can manufacture three types of boiler economizer, bare tube economizer, H finned tube economizer and spiral finned tube economizer.


• H-finned tube economizer is high efficient heat exchanger economizer which is consisted of H-finned tubes.


• Compared with bare tube economizer, H-finned tube economizer can enlarge the heat exchange area and reduce the number of tubes.


• It also can increase the flue gas flow area in order to reduce the flue gas flow speed and abrasion.
H-finned tube can be made as double H finned tubes , with high rigidness to fit long tube row.


• The spiral finned economizer is a newly designed heat transfer equipment, consists of spiral fin tubes to overcome the serious abrasion and short service time.


Specifications

DescriptionBoiler economizer
MaterialAlloy steel, Carbon steel, SA210C ,SA213T22, etc.
Material standardASTM, EN or ISO etc.
DimensionCustomization
Weight

Min: 10 ton

Max.:1000 ton

Smelting Process:EF+LF + VD
ProcessMaterial→Ingot → Hot/Cold-Rolling→ Heat treatment (Normalizing+ tempering) → Inspection →rough machining→UT →2nd Heat treatment →finishing machining →Inspection
UT standardASTM A388 or EN10228, etc

Quality Control


• Impact test and Strength calculation report with applied materials information.

• 100%NDT(non-destructive inspection) report of steel plate, tube and electrode.

• X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler.

• Hydraulic test report: ensure the standard working pressure and safety.


Company profile


Fabrication area of 400,000 square meters
150 Engineers
600 Coded welders
60 Licensed Inspectors(NDT Level-III instructors)
Class-A Licenses for Design and Manufacture Boiler
ISO 9001:2008 Quality System

ASME Certificate of Power Boilers

ASME 'S','U' and NB stamp authorization


Products in the workshop


China A335 P9 / SA 335 P22 ASTM Standard Power Plant Economizer 6 Inches Diameter Sprial Welding supplier

A335 P9 / SA 335 P22 ASTM Standard Power Plant Economizer 6 Inches Diameter Sprial Welding

Inquiry Cart 0