Home /Boiler Parts /

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part

Brand Name:HD BOILER
Certification:ISO9001 , SGS , TUV , ASME , EN
Model Number:Boiler Header
Minimum Order Quantity:1 Set
Delivery Time:50 Days
Payment Terms:L/C, T/T, Western Union, D/P, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Address: Address: N0.1, Dongli Road, Donglai, Zhangjiagang City, Jiangsu Province, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part


Product Description


Boiler Headers form an important part of all types of boilers. Steam from the generating tubes is collected in headers which are therefore always under pressure.The stubs of various sizes are very carefully welded to the main body of the header to provide the desired openings from the headers.


Material


Natural gas industry Boiler Header can be made of alloy steel, carbon steel or other kind of material as per the customer’s requirements. It conforms to the standard of ASTM, EN, DIN, GB.

The manufacturing equipment is 30~185MN hydraulic press, the forging ratio >3, the technical condition is in accordance with the standard of ASTM, EN, DIN, GB.

MaterialCarbon steel,Alloy steel,Stainless steel.
LengthAccording to costumes requirements.
Temperature Range300℃~1500℃
Diameter(OD)76mm~914mm

Technical Parameter:

MaterialsStainless Steel
Typeheader body, end cover, tube joint, hand cole, thermometer socket;seamless steel tube, pressure parts
Advantagesadvanced welding, safe and reliable operation
BrandJinan Yuanda
RemarksCustomized order is also accepted.

Quality Control


1. Strength calculation report with applied materials information.
2. 100%NDT(non-destructive inspection) report of steel plate, tube and welding rod.
3. 100%X-ray inspection report (welding seam): to ensure the quality of the entire boiler.
4. Hydraulic test report: ensure the standard working pressure and safety.


Company Introduction


Established in 1985,Zhangjiagang Hua Dong Boiler Co.,Ltd.(trading as HD Boiler),produces power plant; industrial; waste heat; waste incineration; biomass; organic heat carrier and electric steam boilers. Coupled with a comprehensive range of heating surfaces, HD Boiler brings to the market a unique service including boiler design , fabrication, installation, maintenance and replacement of boiler pressure parts.


1. Fabrication area of 200,000 square meters

2. 80 Engineers

3. 200 Coded welders

4. 30 Licensed Inspectors(NDT Level-III instructors)

5. Class-A Licenses for Design and Manufacture Boiler

6. ISO 9001:2015 Quality System

7. ASME Certificate of Power Boilers

8. ASME 'S','U' and NB stamp authorization



Design and Manufacturing capacity


Two automatic coiler production lines

Hot bending to minimum bending radius 0.6D

Membrane wall tube bending , with horizontal and vertical panel bending machines

Panel fabrication for up to for 1000MW power plant boilers

Fabrication of CFB Boiler Cyclone Separators

Fabrication of Header to Chinese standards(GB), US standards (ASME), or EU standard (EN)

Broad range of heat treatment equipment including 10 furnaces, offering normalizing and tempering


China Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part supplier

Steel Electric Condensing Gas Boiler Header , Power Plant CFB Boiler Spare Part

Inquiry Cart 0