Add to Cart
IEC61215-2 Cord Anchorage Pull Tester for Testing Pulling Force Of
Non-Detachable And Movable Power Cord
This tester is suitable for testing pulling force of non-detachable
and movable power cord.It has the advantages of beautiful
appearance, reasonable layout, good reliability and convenient
maintenance.
IEC61215-2-MQT14.2
No | Item | Spec |
1 | Power supply | 220VAC±10%,50/60Hz |
2 | fuse | 5A |
3 | Power | 200W |
4 | Counter | 0~9999(×1,×10,×100)can be preset |
5 | Test speed | 5~60t/min |
6 | Weight | 3N,15N,15N,42N,55N,70N,80N,100N one for each |
7 | Dimension | 750×500×700mm(W×D×H) |
8 | Weight | 50KG |
Installation
1. Check whether the instrument has been damaged or broken in
transit;
2. Check whether the equipment is inverted;
3. Check whether the specifications on the nameplate are consistent
with the order’s;
4. Check that the packing list is consistent with the object.
Do not use this instrument if any of the above occurs, and contact
us in time.
2.2 Installation requirement
1. This instrument should be placed on a horizontal and stable
worktable. If there is any, it should be adjusted first.
2. Operation ambient temperature:25 + 10 ° C, relative humidity:
50±30%RH RH.
This instrument should be kept away from heat source and corrosion
source.
4. This instrument works with a good grounding of 220V / 50Hz + 10%
power supply.
1. bar 2. centrifugal ring 3. weight 4. interface
1. Put the plug up, insert power cord into the hole of horizontal
bar (1), and required weight (3) is attached to the bottom of the
plug.
2. Connect with power supply, turn on the power (5), on the preset
counter (1) set test number (set number and press the reset button
to save it).Press test start button (4), tester operates;rotate
speed control knob (3) to adjust test speed.
3. When all tests are done, it stops and alarm rings;then take off
the sample to check damage degree.
4. Turn off the power and finish the experiment.
1.Cleaning: the surface of the instrument often needs to be cleaned
and cleaned by anti-rust oil and dry cloth to prevent the dead or
corroded parts of the unit.
2. Cleaning: make daily check list and check the device regularly
to keep it clean.
3. Lubrication: Add a little lubricating oil on movable axis;wipe
surface of electroplating and smelting tool with lubricating oil to
avoid rust.
4. Power supply: before test, turn on the power for 2 ~ 5 minutes
to check whether the machine is abnormal.If there is any
abnormality, cut off the power immediately, and contact us in
time.After the test, cut off the power.
Check: check regularly for cracks and breakage on the external skin
of power cord to avoid unnecessary damage and other accidents.
Calibration: