IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.

Brand Name:KingPo
Certification:ISO17025 Calibration certificate
Model Number:KP-NL-001
Minimum Order Quantity:1
Delivery Time:7 working days
Payment Terms:T/T
Contact Now

Add to Cart

Verified Supplier
Location: Hong kong Hong kong China
Address: RM C, 13/F, HARVARD COMMERCIAL BUILDING, 105-111 THOMSON ROAD, WAN CHAI, HK
Supplier`s last login times: within 11 hours
Product Details Company Profile
Product Details

IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.

Introduction

1.1 Purpose

This machine is mainly used for torque test after retention test. The test time is one minute and the torque value can be realized according to the standard configuration of different weights.

1.2 Standard

IEC61215-2-MQT14.2

1.3 Technical parameter

NoItemSpec
1Working position1
2Wire diameter0-60mm
3Torque range0.1Nm,0.15Nm,0.35Nm,0.6Nm ,0.8 Nm,0.9 Nm 1.0 Nm,1.2Nm
4External dimenstion430×180×250(W×D×H)
5Weight50Kg

Installation

2.1 Disassembling inspection

1. Check whether the instrument has been damaged or broken in transit;

2. Check whether the equipment is inverted;

3. Check whether the specifications on the nameplate are consistent with the order’s;

4. Check that the packing list is consistent with the object.

Do not use this instrument if any of the above occurs, and contact us in time.

2.2 Installation requirements

1. This instrument should be placed on a horizontal and stable worktable. If it is uneven, it should be adjusted first.

2. Operation ambient temperature :25 + 10℃, relative humidity: 50±30%RH


Operation

3.1 Structure

1. Substrate: provide support for parts above.

2. Sample fixture: for holding sample.

3. Rotary clamping head: used for holding the end of the plug.

4. Weight lifting wheel: radius 50mm (i.e. torque lever).

5. Weight: see 1.3 in detail.

3.2 Procedure

Please follow the following steps:

1. Select the suitable sample to insert the end of the power cord into the rotary clip, rotate the clamp and tighten.

2. Put the sample end into the sample holder and hold it firmly after tightening.

3. Hang required weights on the hanging wheel line, twist it for 1 ~ 2 laps.

4. After the load is maintained to the standard time, take off the sample.

5. Finish operation.


Maintenance

4.1 Daily maintenance

1.Cleaning: the surface of the instrument often needs to be cleaned and cleaned by anti-rust oil and dry cloth to prevent the dead or corroded parts of the unit.

2. Cleaning: make daily check list and check the device regularly to keep it clean.


Calibration:


China IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test. supplier

IEC61215-2-MQT14.2 Power Cord Torsion Tester For Torque Test After Retention Test.

Inquiry Cart 0