

Add to Cart
iBeehive Steel Buildings
Raw Material Factor
Raw material factor Steel is the main frame of the steel warehouse
building, accounting for about 70%-80% of the total cost of the
steel warehouse building. The fluctuation of the market price of
steel structure raw materials directly affects the cost of the
steel warehouse building. The material and loading surface of the
section steel, the thickness of the cladding and the price of the
material vary greatly. The raw material of steel structure is the
main factor affecting the cost of steel structure workshop.
In fact, for material procurement, the main thing is to control the
price in the project cost. Due to the wide variety of materials in
the construction market with different prices, how to choose the
source of materials is very important. The supplier shall analyze
the market material price and material price provided by the buyer,
and negotiate with the owner to select a reasonable material
procurement method to reduce the project procurement cost and
improve the project economic benefits.
Factors Of Plant Design
Factors of plant design, reasonable design of steel structure plant
scheme is the key issue to control cost. The different design
options of the plant directly affect the amount of steel used. In
order to control the amount and cost of steel, the scheme of the
steel structure workshop should be reasonably designed.
The base cost is closely related to the plant geology. The basic construction period is about 25% of the total construction period of the factory, and the cost also accounts for 15% of the total cost. Unqualified basic construction quality and improper selection of material quality will result in the failure of the steel structure workshop load to be well transmitted to the foundation, increasing the direct load force of the factory and increasing the dynamic load borne by the factory.
Main Steel Grade: | Q355 Q345 Q235 Q355B Q345B Q235B |
Beam & Column: | Welded or Hot rolled H-section |
Purlin: | Hot Dipped Galvanized C Z Purlin |
Bolt Accessories: | Foundation bolt & High -Strength Bolts & General Bolt |
Wall & Roof: | EPS /Glass Wool/Rock Wool /PU Sandwich Panel Or Corrugated Steel Sheet |
Door: | Sliding Sandwich Panel Door / Rolling Metal Door |
Window | Aluminum Alloy Window / PVC Window |
Surface | Hot-dip galvanized or painted |
Other | Semi-transparent Skylight belts,Ventilators,Downpipe and Gutter ,Crane 5MT, 10MT, 15MT |
Drawings & Quotation: | 1) Customized design is welcomed. |
iBeehive is a professional manufacturer of steel structures, and
bailey bridges with 21 years of experience, finished 3520 projects
total of 17600000 sqm. We specialize in providing complete
solutions including consulting, design, fabrication, and erection
of high-quality pre-engineered steel building and steel structure
products.
We have 2 factories with a total area of 21000 m², iBeehive has
served the pre-engineered building industry with the highly trained
crews, specialized equipment, CWI inspector, and 20 professional
design team.
1. Design service:
From structural design to cost-effective
2. Manufacturing:
We have two workshops with a total area of 150,000 square meters
and three production lines for the shortest lead time.
For every process of processing and manufacturing, we can provide
pictures and videos to let you know your construction process in
real-time.
3. Installation Instructions:
We provide one-stop installation guidance, from steel column and
purlin installation, welding, to wall panel and roof installation,
as well as downpipe and door and window installation.
Instructional materials include pictures, videos, or online call
instructions.
4. After-sale service:
We ship with 1-3 buckets of paint. When the steel components are
worn out in shipping, you can repair them in time.
We offer the most complete packaging to prevent moisture in
transit.
Sheets damaged by force majeure in transit, we can ship new ones
for free.
After being put into use, any problem can be solved by contacting
us.
Payment Terms
1) Payment: T/T(30% prepaid as deposit, balance 70% before
shipment) or L/C at sight
2) Delivery time: 15~40 days, as pre customers' order
3) Shipment Loading: 20"GP, 40"GP, 40"HQ, 40"OT or in bulk
Contact us for more details.