Home /Steel Structures /

High Reliable Temporary Steel Pedestrian Q345B Prefabricated Steel Material

High Reliable Temporary Steel Pedestrian Q345B Prefabricated Steel Material

Brand Name:ibeehive
Certification:ISO9001-2008 SGS CCIC
Model Number:200
Minimum Order Quantity:1 set
Delivery Time:Shipped in 1 month after payment
Place of Origin:Shenyang
Contact Now

Add to Cart

Verified Supplier
Location: Shenyang Liaoning China
Address: Room 202, D07 building SISP, Hunnan District, Shenyang
Supplier`s last login times: within 48 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

200 Type Bailey Bridge With SS (Single Row Single Layer) Q345B prefabricated steel material

Product Description:

Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.


ZB 200 panel bridge: ZB 200 panel bridge is similar to the compact 100 panel bridge from their appearance.

The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels.

This method can decrease inelastic deformation caused by the oversized pinholes. Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree.

Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections.

Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges.

Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
The part between braced frame and panels is fixed through bridging so as to prevent the whole bridge from side bending. After the erection, there will be a pre-arched degree over the span of the bridge. Besides it can be assembled into single-lane bridges. The compact 200 panel bridge can also be assembled into double lane bridge, hence it broadens its application range. It is suitable for the load designs of HS-15, HS-20, HS-25 and pedrail-50 etc.

The delivery situation:




China High Reliable Temporary Steel Pedestrian Q345B Prefabricated Steel Material supplier

High Reliable Temporary Steel Pedestrian Q345B Prefabricated Steel Material

Inquiry Cart 0