Industrial Construction Workshop Steel Structure Buildings Hot Dip Galvanised

Brand Name:ibeehive
Minimum Order Quantity:500 tons
Delivery Time:Shipped in 30 days after payment
Place of Origin:shenyang
Price:US $800 - 1000
Supply Ability:5000 tons per month
Contact Now

Add to Cart

Verified Supplier
Location: Shenyang Liaoning China
Address: Room 202, D07 building SISP, Hunnan District, Shenyang
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

Industrial Construction Workshop Steel Structure Buildings Hot Dip Galvanised

Product Description:
(1) Simple Steel Construction
Main structureSingle span: L -shorter than 18m, H -lower than6m
Maintenance systemRoofColored sheet with 50mm glass wool
WallColored steel sheet
DoorWind resistance rolling door(within 10m2)
WindowVery few
Suitable marketNo snow, wind load below 0.4kn/m2

(2) Standard Steel Construction
Main structureSingle span: L -shorter than 24m, H -lower than8m
Maintenance systemRoofColored sheet with 50mm glass wool
WallColored steel sheet or 50mm EPS sandwich board
DoorWind resistance rolling door(within 15m2)
WindowAlu. Alloy (can use with skylight)
Suitable marketSnow loading below 0.5kn,wind loading below 0.5kn/m2

(3) Coastal(High Wind Speed)Steel Construction
Main structureSingle span: L -shorter than 18m, H -lower than 6 m
Maintenance systemRoofColored sheet with 50mm glass wool
WallColored steel sheet or 50mm EPS sandwich board
DoorWind resistance rolling door(within 15m2)
WindowAlu. Alloy (can use with skylight)
Suitable marketSnow loading below 0.7kn,wind loading below 1.2kn/m2

(4) Cold Region(Heavy Snow) Steel Construction
Main structureSingle span: L -shorter than 18m, H -lower than 6 m
Maintenance systemRoofColored sheet with 50mm glass wool
WallColored steel sheet or 50mm EPS sandwich board
DoorPU foamed rolling door
WindowAlu. Alloy (can use with skylight)
Suitable marketsnow loads below 3kn, wind load below 1KN/M2

(5) Steel Construction with Crane(5T,10T,15T,20T)
Main structureSingle span: L -shorter than 20m, H -lower than 10 m
Maintenance systemRoofColored sheet with 50mm glass wool
WallColored steel sheet or 50mm EPS sandwich board
DoorWind resistance rolling door (within 15m2)
WindowAlu. Alloy (can use with skylight)
Suitable marketSnow 0.5kn, wind load below 0.5kn/m2
Steel Materials list

Bellow materials are general used in steel buildings , but we often customized each type depend on clients requirment .


Item NameMaterials CharacteristicsMaterial GradeSurface Treatment
Steel ColumnH shape,Box,Steel Pipe,Hot tolled sheetQ235B,Q345BPaint or Hot dip Galvanized
Steel beamH shape,Box,Steel Pipe,Hot tolled sheetQ235B,Q345BPaint or Hot dip Galvanized
Steel BracingSteel Rod,Steel Pipe,Angle SteelQ235B,Q345BPaint or Hot dip Galvanized
Steel PurlinC or Z purlins(Thickness1.8mm~3.0mm)Q235B,Q345BHot dip Galvanized
External Wall panels,Roof panelsSingle colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU.Galvanized Steel+PaintingAlu-zin 150g,Fluorocarbon pain
Steel buildings DoorSlidding or Rolling doorSteel or Aluminum sheetPaint or Hot dip galvanized
Steel buildings WindowsAluminum alloy-Glass,Aluminum alloy-shutterT=1.0-2.0mmAlloy
Skylighting panelsFRP T=1.5mm-1.8mmCoefficient of thermal expansion:2.2x10-5/cmLight Tranmitar 85%
VentilatorTurbine ventilator on a ridgeSteel,Stainless steel ,PCPaint or Hot dip Galvanized
GutterGalvanized steel plate,Stainless steel plateT=2.0mmHot dip galvanized
DownpipePVC pipe,color steelpipe Y=0.5mmDia110mmpaint
Hight BoltOrdinary ,High strength10.9S,4.8SHot dip galvanized,Steel
Ground boltsSteel RodM24,M27,M30,M33,M39,M4210.9SSteel
Steel&panels&sheets

steel structure frame and roof panels/wall panels/accessories almost like them:

Welded steel frame

Welded steel structure frame/warehouse/workshop/Prefabricated house/storage/Meatal shed must have strict process and good qulity , than it is safe and long life .

1. Strictly control the welding position of the relative position of size , welding pass behind the prospective;


2. Reasonablly selection of welding parameters and order to prevent crack;


3. Electrode required drying, welding area need to clean up, welding process, together with the appropriate welding current, decrease of welding speed, gas completely escape , prevent the formation of weld porosity;


4. When continuously multi-layer welding, each weld layer after cleaning, prevent the formation of slag;


5. Selection for current, avoid arc pull too long, control electrode angle and arc method, avoid the generation of undercut.

Attached: welding process parameters


welding process parameters


Materals(mm)Electrode diameter (mm)Welding current(A)Welding voltage(V)Welding speed(m/min)
<10Ø3.2200-25030-380.2-0.3
10-20Ø4.0200-25030-380.15-0.25
>30Ø4.0320-35030-380.3-0.5

Connected Detail

All steel structure warehouse,workshop ,storage ,steel prefabricated house , prefab home,prefab villas ,Steel Beams and Pillars connecteed Detail:



Steel Beams and Brace connected Detail:



Foundation Steel Ground bolts Detail :


Fast Quotations


Quotations for simple buildings can be submitted quickly due to vast experience of our staff and the advanced software we use.


Fast Delivery


(1) We are able to design, detail, fabricate and supply simple buildings in approximately 4 weeks.
(2) Most of our buildings are delivered and erected within 8 weeks (this relies on various factors such as stock position, weather etc).


Site Supervision


(1) A site supervisor is always present at site to ensure that work is being carried out satisfactorily.


(2) Any problems that arise are quickly dealt with to minimise any delays.


(3) Safety on site is also made a priority.

China Industrial Construction Workshop Steel Structure Buildings Hot Dip Galvanised supplier

Industrial Construction Workshop Steel Structure Buildings Hot Dip Galvanised

Inquiry Cart 0