100HP 8 Ton Tractor Crane Tower Erection Tools With Earth Auger

Brand Name:SHENGHONG
Certification:ISO
Model Number:xxx
Minimum Order Quantity:1 SET
Delivery Time:30 days after payment
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Site Member
Address: Tanjietang,Xinhe Village,Yetang,Shanghu Town,Chagnshu City,Jiangsu Province,China
Supplier`s last login times: within 18 hours
Product Details Company Profile
Product Details

8 Ton Tractor Crane with Earth Auger for Pole Erection

Introduction

This device has the function of digging ,vertical pole, put line ,bulldozing ,grinding, traction, referred to as the put line integrated machine,patent number:20122172343.2,widely used in electric power ,telec-ommunications,municipal energingconstruction,planting trees,cement poles pit digging ,solar photov-olatic power generation project in solar panel rack ,screw pile,vertical drilling rod,ditching,put line,backfill soil,ground of traction and lifting 3-8Tobject,is the ideal choice for individuals and units of construction eq-uipment.Suitable for all kinds of terrain.the losser layer,clay layer,containing pebbles,grave soil, weathered rock and soil,frozen soil building garbage,backfill sand,garbage layer


Feature

1. Have four hydraulic stabilizer legs, with cross-country 2 or 4 wheel-drive, with wide tires

2. 360° rotation gear motor, hydraulic hoisting and drilling system, combining the auger drill rig with crane, one equipment can realize the drilling and pole uprighting work, more efficient and cost-effective.

3. YTO tractor as power, strong enough , strong cross-country power. Fully hydraulic driving. Full-automatic put and upright the pole.


Benefits of Pole Erection Machine

(1) Huge cost saving , very high speed of work and reduce the burden of labor management

(2) Eliminate the prevailing labor problem completely thus leads to project on time execution.

(3) High production capacity with proper planning and execution per shift of 8 working hours,

(4) which can complete the pole installation of 25 to 30 poles per shift by two labors only.

(5) Pole erection working can be done by two labors only against the current manual practice of 12 to 14 labors.

(6) Takes a little time to make a pit against the time taken by manual labor is 5 to 6 hours.

(7) Cost Saving for contractor.


Data Sheet

TractorYTO/BOMR tractor with 4*4 drive
Power100HP or 73.5 KW
Drilling depth0-6m
Drilling diameter300mm-2000mm
Standard drill pipe300mm-500mm (can customize 500~1200mm drill pipes)
Lift wayHydraulic
Standard drilling time40s (diameter of 500mm, depth 3m)
Applicationloess, clay, pebble sand, weathered granite, tundra etc.
Not suitable forrocks, whole sand bed ,household garbage and so on.
Operator needed1 person

China 100HP 8 Ton Tractor Crane Tower Erection Tools With Earth Auger supplier

100HP 8 Ton Tractor Crane Tower Erection Tools With Earth Auger

Inquiry Cart 0