Home /

Data Collect Unit in Automated Meter Reading System With GPRS / PLC Communication

Data Collect Unit in Automated Meter Reading System With GPRS / PLC Communication

Brand Name:RADARKING
Certification:IEC
Model Number:RDK-JZQ
Minimum Order Quantity:1pcs
Delivery Time:20-30 Working Day
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No.270, Huangjinkou 3rd Village, Hanyang District, Wuhan City, Hubei Province, China
Supplier`s last login times: within 1 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

Data Collect Unit in Automated Meter Reading System With GPRS / PLC Communication


Description:

Concentrator is the centre part of centralized meter reading system, which take responsibility in data reading through carrier/RS485, and then communicate with primary station by using GPRS/CDMA/Ethernet


Specification:

ParameterRDK-JZQ
ModelUplink Channel:GPRS/CDMA/Network
Downlink Channel: Wave carrier

Power Supply Mode

Three Phase Four Wires

Operating Voltage

(3×220/380V)±20%

Rated Frequency

50Hz
Power Consumption
Active Power: ≤10W;
Apparent power: ≤30VA(static power consumption)

Temperature Condition

Standard Operating Temperature: -25~55 centigrade,
Relative Humility: 10%~95%

Weight
2.0 kg

Main Features

  • Uplink channel: communication between concentrator and master
  • Data transfer communication for GPRS, Ethernet
  • Direct connection for RS-232 serial port
  • Direct connection for RS-485 serial port, capable for cascade
  • Infrared communication mode
  • Downlink channel: communication between concentrator and smart meter
  • Communication mode of power line carrier
  • RS-485communication mode
  • Data acquisition
  • Real-time meter reading
  • Reading daily frozen energy
  • Reading historical daily & monthly consumption
  • Reading event
  • Reading meter parameter, status, and real-time data
  • Operation & control
  • Remote switch on &off
  • Prepaid & energy threshold control
  • Key operation for parameter setting & inquiry
  • Events Log
  • Setting & record abnormal events: Power-down, Programing, Cover opening, Terminal cover opening, Reverse power, Phase Fail. The records include data and time
  • Storage capacity
  • 1024 Meters database capacity
  • 2 months capacity for storing daily frozen data in meter
  • 12 months capacity for storing monthly consumption in meter
  • Temporarily storing real-time reading data
  • Terminal maintain
  • Auto-detect and recovery
  • Terminal initialization
  • Remote transmission
  • Resuming broken transmission

Key benefits:

a) PLC/ RF / GPRS communication (On request)

b) Time of Use (TOU) , multi-tariff, holiday setting

c) Easy connection to User Interface Unit (UIU) for split type applications

d) 15 year designed life

e) Balance alarm can be set by user according to his own need


Safety precautions:
- Use only isolated tools.
- Do not connect the meter to a 3 phase - 415V AC - network.
- Place the meter only in dry surroundings.
- Make sure the used wires are suitable for the max current the meter can measure.
- Make sure the AC wires are installed correctly before activating the current/voltage.
- Do not touch the meter connecting clamps directly with your bare hands, with metal, blank wire or other material as you will have the chance of an electricity shock and a possible chance for health damage.

China Data Collect Unit in Automated Meter Reading System With GPRS / PLC Communication supplier

Data Collect Unit in Automated Meter Reading System With GPRS / PLC Communication

Inquiry Cart 0