Add to Cart
LCD Display Single Phase Electric Meter Build in Relay for ON/OFF Control High Accuracy
The single phase two wire static energy meter is a kind of fully digitized intelligent single-phase watt-hour meter with build in relay for ON/OFF control. It is designed depending on the special chip technology of RDK2000 series digital intelligent electricity steal-resistance watt-hour meters being developed RADARKING R&D group. This kind of watt-hour meter not only has electricity measurement function, but also has intelligent steal-resistance function.
Features
1. Product's Type—LCD (5+1 or 6+2)
2. Electric Power Measurement-- Positive active power, reverse active power which can be measured.
3. Intelligent Design—Imported single-chip which controlled by
microcomputer, full digital metering, with advantages of high
accuracy, good linearity, wide range, low consumption and prevent
from electricity stolen.
4. Reliable Design-- Perfect power source and electromagnetism
compatible design, which are suitable to the strong
electromagnetism disturbance and big occasion of power source
fluctuation.
5. Cover for Meter-- Fully sealed dustproof and waterproof design,
material of cover has excellent flame retardant and anti-corrosion,
anti-aging properties.
6. On-Off Manner—Build in or external switch can be optional.
7. Communication Mode-- Infrared, RS485 interface or carrier
communication module (Optional).
Specifications
1. Standard-- IEC 62053-21:2003, DL/T645-1997/2007.
2. Voltage-- 220V (Single-Phase), 3*220/380V (Three-Phase Four
Wires), 3*100V (Three-Phase Three Wires)
3. Current-- 1.5(6)A, 5(20)A, 5(30A), 5(40)A, 5(60)A, 10(40)A,
10(60)A, 15(60)A, 20(80)A
4. Frequency-- 50Hz
5. Accuracy Class-- 2.0, 1.0, 0.5S; 2.0 (Reactive Power)
6. Pulse Constant(imp/kWh)-- 6400, 3200, 2400, 1600, 1200, 800,
400, 200
7. Clock Accuracy ≤ 0.5s/Day (Reference Temperature 23 centigrade)
8. Power Consumption ≤ 0.8W/phase
9. Data Storage Period ≥ 10 years, period for clock working since
power off is ≥ 5 years
10. Intelligent logic control function
Safety precautions:
- Use only isolated tools.
- Do not connect the meter to a 3 phase - 415V AC - network.
- Place the meter only in dry surroundings.
- Make sure the used wires are suitable for the max current the
meter can measure.
- Make sure the AC wires are installed correctly before activating
the current/voltage.
- Do not touch the meter connecting clamps directly with your bare
hands, with metal, blank wire or other material as you will have
the chance of an electricity shock and a possible chance for health
damage.
- Make sure the protection cover is placed after installation and
has been sealed.
- Installation, maintenance and repair should only be done by a
certified electrician.
- Never break the seals or open the front cover as this might
influence the functionality of the meter.
- Do not through, drop, kick or other physical violence to the
meter as there are high precision components inside that will break
or make the meter measure inaccurate.
- Do not mount the meter in area's with harm gas, dust, mildew or
insects or on unstable surfaces.
Wiring Diagram