

Add to Cart
P4.8 Outdoor Rental LED Screen 576*576mm Cabinet 288*288mm Module Rainproof
Quick details of P4.8 Outdoor Rental LED Screen
1. Physical density: 43402 dots/㎡
2. Ingress protection: IP65
3. Brightness: ≥4500nits
4. Life Time: >100,000 Hours
5. Grey Level: 12-16 bits
Product Specification of P4.8 Outdoor Rental LED Screen
Item | P4.8 |
Pixel pitch | 4.8mm |
Module size | 288*288mm |
Module resolution | 60×60 |
Physical density | 43402 dots/㎡ |
LED type | SMD1921 |
Cabinet size | 576×576mm |
Cabinet resolution | 120×120 |
Cabinet material | Die casting aluminum |
Maintenance way | Front/Rear |
Best viewing distance | ≥4.8m |
Best viewing angle | H: 160°; V:160° |
Driving method (Constant Current) | 1/10 Scan |
Video frame rate | ≥60 Hz |
Refresh rate | 3840-7680Hz |
Brightness | ≥4500nits |
Grey Level | 12-16bit |
Ingress protection | IP65 |
Life Time | >100,000 Hours |
The rate | <0.0002 |
Features of P4.8 Outdoor Rental LED Screen:
1. High brightness, keep clear in the direct sunlight.
2. High refresh rate, highest reach to 7680Hz, no flicker and jitter
in the cell phone video.
3. Front maintenance, easy to replace the module.
4. Light weight,aluminum cabinet.
5. Hard connection, two-in-one interface, signal connection is more stable.
Applications:
1. Stage events: wedding stage, concert, conference, dancing background.
2. Shows: music show, stage performance,
3. Commercial promotion Advertising: shopping mall, stores, street corner
4. Sport live, theater, garthering.
Installation Procedure:
FAQ:
1. Are you a manufacturer or trading company?
We are a Professional OEM/ODM manufacturer which has specialized in
led display industry for more than 15 years.
2. What’s your control system? How is it?
Our most common used system is Novastar, famous brand and good
quality.
3. This is the first time to import, I don’t know how to do.
We offer DDP door to door service, you just need to pay us, then wait to receive order.
5. How long does shipping take?
Express and air shipping usually take 5-10 days. Sea shipping takes
about 15-55 days according to different country.