WEIHUA 250/10 Ton Bridge Crane

Brand Name:WEIHUA
Certification:CQM,CE,3C,CNAS,SGS
Model Number:WH
Minimum Order Quantity:1 sets
Delivery Time:30 days or so
Payment Terms:L/C T/T
Contact Now

Add to Cart

Active Member
Address: North of Wenming West Road, Changyuan County, Henan Province, P.R.C
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Overhead Bridge Cranes can be divided into two groups:

Top Running Bridge Cranes, and

Under Running Bridge Cranes (sometimes called under hung).


The following will take you through a brief list of topics that should be considered. Please take a brief look and then give us a call, and we can help lead you through the maze to the best cost answer for your material handling needs.


A Bridge Crane system consists of three major components.

.the Bridge Crane, which traverses across the runway
2.the hoist & trolley, which traverses across the bridge and lifts up and down
3.the runway, which is tied to the building structure.



Top Running Bridge Crane with Underhung Hoist



Underhung Bridge Crane with Underhung Hoist

Top Running Bridge Crane with Top Running Trolley Hoist

.....................................................................................................................................................................................................................................

Top Running vs. Under Running

Top Running vs. Under Running is primarily determined by two factors:

1.Capacity - Although under running can be up to 25 ton capacity, the practical limit is more like 15 tons and the economic sweet spot is 1 to 7.5 ton range.
2.Support Structure - Under running can be suspended directly from the overhead steel (for lighter cranes). Top running cranes will require a bracket off the building support steel (up to 10 tons capacity) or independent columns for heavier capacities.

The top running configuration is best used in cases where the end user has issues with headroom. The most space efficient configuration is the double girder, top running crane system. When headroom is not an issue a top or under running configuration can be used with either the double or single girder bridge crane.

The above figure shows the three primary methods of supporting a top running crane.

The above figure shows a typical support column point.


The above figure shows a typical runway cross section without the crane rail or fasteners. Intermittent welds should not be used in runways subject to fatigue. The picture shows a channel cap on a wide flange section, this is a typical form of a continuous girder.


China WEIHUA 250/10 Ton Bridge Crane supplier

WEIHUA 250/10 Ton Bridge Crane

Inquiry Cart 0