Double Head Decoiler Ceiling Roll Forming Machine 19 stations 40GP Container

Brand Name:Saibo
Certification:CE/ISO
Model Number:YX52-60
Minimum Order Quantity:1 set
Delivery Time:70 working days after received deposit
Payment Terms:T/T, L/C
Contact Now

Add to Cart

Verified Supplier
Address: Hetou village industrial park, Yangshe town, Zhangjigang Jiangsu China
Supplier`s last login times: within 23 hours
Product Details Company Profile
Product Details

1. Specification of the material

1Suitable MaterialPPGI, G550
2Width of the raw materialAccording to the final profile
3Thickness0.4-0.8mm

2. Machine Detailed Parameters

Machine structure
Wire-electrode cutting structure
Total power

Motor power-5.5kw

Hydraulic power-4kw
Roller stations

19 stations+ one of rectify

Productivity


0-15m/min

Drive system


By chain,1.0 inch

Diameter of shaft


¢56mm

Terms Of Payment


30%T/T 70% pay before shipment

3. Profile drawing


4. Specification of Components


(1) 3T Double Head Hydraulic Un-coiler

  • Width of feeding: 350mmX2
  • Capability: 3 TonX2
  • Bound of expand &fight: 420mm—550mm
  • Main power: 4kw x2
  • Hydraulic power: 3kw

(2) Main Roll Forming Machine

  • Roller material: #45
  • Shaft diameter: ¢56mm
  • Main frame by steel plate welding

(3) Hydraulic cutting system

  • Cutting after forming: Cut the sheet after roll forming to required length
  • Material of blade:Cr12, 58-62 HRC hardness
  • Length measuring: Automatic encoder length measuring

(4) Computer Control Cabinet

  • Programmable setting of profile length and quantity
  • Operating system language: English and Chinese
  • Computer used to control length & quantity. Machine will automatically cut to length and stop when required quantity is achieved

5. Warranty

  • Warranty: 1 year warranty from date of shipment
  • Guarantee:

1: Guaranteed against malfunctions due to manufacturing defects for 1 year after date of shipment. Repairs will be made free of charge.

2: Repairs will not be performed free of change even during the guarantee period in the follow circumstances

- Damage occurs due to a natural disaster

- Malfunction occurs due to user error

- Malfunction occurs due to modifications

- Malfunction occurs due to further movement or shipment after installation

3:Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if manufacturer’s engineer has to be send to purchaser’s factory to maintain the machine during the guarantee period.


6. Installation and training:

a. If buyers visit our factory and check the machine, we will teach you how to install and use the machine, and also train your workers/technician face to face.

b. Without visiting, we will send you user manual and video to teach you to install and operate.

C. If buyer needs our technician to go to your local factory, please arrange board and lodging and other necessary things.

China Double Head Decoiler Ceiling Roll Forming Machine 19 stations 40GP Container supplier

Double Head Decoiler Ceiling Roll Forming Machine 19 stations 40GP Container

Inquiry Cart 0