Hydroelectric Generator Turbine Rotor Forging Heat Treatment Custom 20SiMn

Brand Name:HUIXUAN
Certification:ISO,BV,SGS,IST,UL.CTI
Model Number:water turbine operation frame
Minimum Order Quantity:1 piece
Delivery Time:30-60 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Address: A 1002,HuaJian Mansion,Zhangjiagang City,JiangSu Province,China
Supplier`s last login times: within 26 hours
Product Details Company Profile
Product Details

Hydroelectric Generator Turbine Rotor Forging Heat Treatment Custom 20SiMn


Products:

Vertical water turbine main shaft,horizontal water turbine main shaft,water turbine main shaft,water turbine generator main shaft,water turbine operation frame,water turbine thrust disc,magnet yoke


Products reference:

Material20SiMn,1045,35SiMn,4140
Forging equipment8000T Open die hydropress
Application

Hydro electric generator transfer mechanical energy into electrical energy by rotor

Melting processEF+LF+VD
Production process

Forging+heat treatment+rough machining+finish treatment

Forging ratio

≥3.5

Applicable standardASTM,ASME,DIN,JIS,ISO,BS,API,EN
Executive standardJB/GB/EN/DIN/JIS/ASME/ASTM/ISO
Certification authorityISO9001:2008,BV,SGS, IST, UL,CTI
Delivery term

Rough machining(N+T);finish machining(Q+T)


Test equipment


Spectrograph,ut device,tensile and compact test machine,metalloscope,outside micrometer,bore dial indicator,hardness test machine

ServiceOur service included the forging, process, heat treatment, finish machining, package, local logistics, customers clearance and maritime transport. We took the customer’s requirements as the principal thing, and pay attention on the products quality.

Custom properties


Material elementsCSiMnPSCrNiMoOthers
20SiMn0.16-0.220.60-0.801.00-1.30≤0.035≤0.035≤0.30≤0.30---
10450.42-0.500.17-0.370.50-0.80≤0.035≤0.035≤0.25≤0.30--
41400.38-0.430.15-0.350.75-1.00≤0.035≤0.0400.80-1.10-0.15-0.25--

Mechanical property

Dia.(mm)


TS/Rm(Mpa)


YS/Rp0.2(Mpa)


EL/A5(%)


RA/Z(%)


Type Of notch


Impact energy


HBW

20SiMnØ15≥450≥255≥14--U≥39
1045Ø25≥600≥355≥16≥40V≥39≤229HBS
4140Ø10740~1000450~850≥12≥25V≥40≤250HBS

Process procedure:

Forging process flow quality control: Raw material steel ingot into warehouse(test the chemical content) → Cutting→ Heating(Furnace temperture test) → Heat treatment after forging(Furnace temperture test) Discharge the furnace(blank inspection)→ Machining→ Inspection(UT,MT,Visal diamention, hardness)→ QT→ Inspection(UT, mechanical properties, hardness, grain size)→ Finish machining→ Inspection (dimension)→ Packing and Marking(steel stamp, mark)→ Storage Shipment


Commerce clause


Max weight50T
MOQ1PC
Delivery time30-50 days
Packagewood pallet,steel frame
Delivery termFOB;CIF;CFR;DDU;
Payment termT/T,LC
type of shipping

By ocean,air


Keywords:

Various type water turbine main shaft foring,Water turbine main shaft is the key parts of hydro electric installation,utilize water power to rotate water turbine,by means of connection of water turbine main shaft,magnet yoke,thrust block,other key components as well.transfter water energy into mechanical energy,If connect generator to water turbine,as water turbine rotate it will generate electric power,meanwhile mechanical energy transfer into electrical energy

Excellent mechanical properties;Produce different dimension based on customer’s requirements;

Advanced manufacture equipments and inspection devices;Excellent technical personality;

Control the production procedure strictly;Pay attention on the package protection;Quality full service.


China Hydroelectric Generator Turbine Rotor Forging Heat Treatment Custom 20SiMn supplier

Hydroelectric Generator Turbine Rotor Forging Heat Treatment Custom 20SiMn

Inquiry Cart 0