

Add to Cart
Horizontal Type Boiler Mud Drum Cylindrical Pressure Vessel Water
Pipe
Boiler Mud Drum
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler
Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air
Preheater,Boiler Air Preheater
Product Name | Horizontal Type Boiler Mud Drum Cylindrical Pressure Vessel Water
Pipe |
Applied Area | Natural circulation boiler |
Drum Shell Plate Material | Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70 Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353 |
Drum Head Material | Same as shell |
Nozzle Tube Material | As per design |
Standard | China GB, ASME, EN |
Manufacturer Grade | China A Grade, ABS Certificated, TUV Certificated |
Working Temperature | Saturation Temperature at rated pressure |
Working Pressure | 1.6 MPa ~ 22.5 MPa |
Shell Plate Thickness (Drum Wall Thickness) | ≤150 mm |
Drum Diameter | ≤3,200 mm |
Drum Length | ≤25,000 mm |
Welding | Shell : SMAW, SAW Nozzle tube : GTAW (TIG), SMAW |
Welding NDT | Shell longitudinal seam : 100% RT, 100% UT Shell circumferential seam : 100% RT, 15% UT Nozzle tube angle seam : 100% UT, 100% MT |
Boiler Parts
Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone
Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen
Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler
Tubeshield,Boiler Ditch Tube
Suzhou ORL Power Engineering Co., Ltd.is located in Suzhou, Jiangsu
Province.
ORL Power is a leading company and exporter of industrial
boilers,power plant boilersand boiler parts (including steam drum,
membrane waterwall panel,header,economizer, evaporator,
superheater,H-fin economizer, spiral fin tube, air preheater, heat
pipe, flue etc.), seamless steel tubes/pipes and ERW steel
pipes.ORL provides our customer with full range of services
including boiler design, fabrication, installation and
commissioning, boiler maintenance, and supervision at site. Our
product and service include design and manufacture industrial
boilers, pressure vessels and tanks, and pressure parts for power
plant boilers (600MW, or 1000MW).
Product Description
Boiler Parts
ORL offers prompt response, professional products, and all-around
service to our customers. Our experienced sales team and engineers
are waiting for your enquiry and ready to provide sincere service.
We cordially welcome domestic and overseas friends to visit our
company and manufacturing bases, and look forward to building up
long-term, mutual cooperative relationship with you.
FAQ
A: General small equipment will be ready for shipment in 20-25 days
if the materials are in stock, or in 35-40 days if the materials
are not in stock.
Large equipment delivery time should be determined after technical
discussion. Please contact our sales.
A: Yes, we could offer the sample tube or sample materials for free charge, but the cost of freight should be paid by Customer.
A: General small equipment, the 100% of contract price should be
paid after signing. Alibaba third party guarantee is available.
Large equipment payment schedule, please contact our sales.
A: General small equipment we guarantee 12 months from the date of
shipment departure.
Large equipment warranty period is 12 months from the date of
commissioning or 18 months from the date of shipment departure
which occurs earlier.
Contact Information