Diesel Water Heat Boiler Steam Drum Thermal Insulation SGS Certification

Brand Name:ORL Power
Certification:ISO9001/SGS/TUV/ASME/EN
Model Number:Customization
Minimum Order Quantity:1 Set/Sets 10tons
Delivery Time:50~100 Days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

Diesel Water Heat Boiler Steam Drum Thermal Insulation SGS Certification



Description

In the water tube boiler the upper drum (Boiler steam drum) provides for separation of steam from water. It also provides liquid holdup capacity (typically 10 to 60 seconds) to allow for a dynamic response to load changes without losing liquid in the downcomer and riser tubes. The size of the steam drum is determined by the volume required for a clean separation between steam and water to produce a dry saturated steam, it also provides an adequate amount of steam storage. The steam drum is also called the upper drum.

Product parameter

Product NameBoiler Steam Drum ( Steam Water Separator )
Applied AreaNatural circulation boiler
Drum Shell Plate Material

- Carbon Steel : Q245R, P265GH, SA516-Gr.60/65/70
- Alloy Steel : Q345R, Q375R, 15CrMoR, 12Cr1MoVR, P355GH , DIWA353

Drum Head MaterialSame as shell
Nozzle Tube MaterialAs per design
StandardChina GB, ASME, EN
Manufacturer GradeChina A Grade, ABS Certificated, TUV Certificated
Working TemperatureSaturation Temperature at rated pressure
Working Pressure1.6 MPa ~ 22.5 MPa

Shell Plate Thickness
(Drum Wall Thickness)

≤150 mm
Drum Diameter≤3,200 mm
Drum Length≤25,000 mm
Welding

- Shell : SMAW, SAW
- Nozzle tube : GTAW (TIG), SMAW

Welding NDT

- Shell longitudinal seam : 100% RT, 100% UT
- Shell circumferential seam : 100% RT, 15% UT
- Nozzle tube angle seam : 100% UT, 100% MT


Name&TypeSupply Ability:FOB Price
Boiler drum100Ton/Tons per MonthContact Me Get Latest Price
Boiler header100Ton/Tons per MonthContact Me Get Latest Price
Boiler waterwall panel500Ton/Tons per MonthContact Me Get Latest Price
Boiler economizer500Ton/Tons per MonthContact Me Get Latest Price
Boiler super heater300Ton/Tons per MonthContact Me Get Latest Price
Boiler air preheater300Ton/Tons per MonthContact Me Get Latest Price
Other300Ton/Tons per MonthContact Me Get Latest Price



Product Description






Boiler Parts
Boiler Drum,Boiler Waterwall Panel,Boiler Economizer,Boiler Header,Boiler Cyclone Separator,Boiler Chimney Flue Pipe,Boiler Air Preheater,Boiler Air Preheater




Boiler Parts
Boiler Super Heater,Boiler High Temp Superheater,Boiler Cyclone Separator,Boiler Flue,Boiler Heat Pipe Air Preheater,Boiler Gen Bank,Boiler Heat Pipe Elements,Boiler Tube Pin,Boiler Tubeshield,Boiler Ditch Tube


Boiler Product Production
Boiler Cyclone Separator WorkShop, Boiler Coil Workshop, Boiler Waterwall Workshop.

Boiler Product Test
Impact test,The scene to examine the water-wall,Industrial TV monitoring,Snake-like pipe water pressure test,Header endoscopic detection,Header weld inspection

Testing Center




Packaging & Shipping



Trading Process



ORL offers prompt response, professional products, and all-around service to our customers. Our experienced sales team and engineers are waiting for your enquiry and ready to provide sincere service. We cordially welcome domestic and overseas friends to visit our company and manufacturing bases, and look forward to building up long-term, mutual cooperative relationship with you.

Contact Us

ADD: 11 East Renmin Road, Zhangjiagang City, Jiangsu, China
Phone:+86 0512-56770166
E-mail: info@orlpower.com
Website: http://www.orlpower.com





















































China Diesel Water Heat Boiler Steam Drum Thermal Insulation SGS Certification supplier

Diesel Water Heat Boiler Steam Drum Thermal Insulation SGS Certification

Inquiry Cart 0