20U 19" Thermostatic Sandwich Outdoor Electrical Cabinet With Emerson Power System

Brand Name:ESTEL
Certification:ISO9001
Model Number:ET111122656511520
Minimum Order Quantity:1PC
Delivery Time:15 to 20 days
Payment Terms:T/T, L/C, D/A, D/P, Western Union, MoneyGram
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: 3A-8, SHUIWAN 1979 SQUARE (PHASE II), NO. III, TAIZI ROAD, SHUIWAN COMMUNITY, ZHAOSHANG STREET, NANSHAN DISTRICT, SHENZHEN
Supplier`s last login times: within 35 hours
Product Details Company Profile
Product Details

20U 19" Thermostatic Sandwich Outdoor Electrical Cabinet Emerson Power System Monitoring Unit

20U 19" Thermostatic Sandwich Outdoor Telecom Cabinet With Emerson Power System, Monitoring Unit


Technical Parameters:


ConfigurationConfigurationTechnical Parameter
CabinetModelET6565115-EQ
Protection LevelIP55
External DimensionH1150mm×W650mm×D650mm
Internal Dimension19inch 20U
Material

Galvanized steel, 1.2mm thickness, single wall.

Thickness of bearing parts: 2.0mm

InsulationPEF
CoatingPolyester powder coating
ColorRAL7035
LockAnti-theft three-point locking system
HingeInner hinge
Installation OptionsFloor mounted
Cable RoutingCable in and out from the bottom of cabinet
MaintenanceOne front door,front maintenance.
CoolingDC Air conditioner500W 220VAC 50Hz
Others220VAC 50Hz LED lamp
The entrance guard switch
EnvironmentWorking Temperature-40℃~+55℃ (+Solar Radiation)
Storage Temperature-40℃~+70℃
Working Humidity5%~95%(No condensation)
Working Altitude0~4000 meters

Sanwich structure panel, galvanized steel, double wall with heat insulation


Cabinet installation

Unpacking

Outdoor integrated cabinets are generally packed in wooden cases. When disassembling the package, take care to avoid damage to the cabinet.



Cabinet base

The size of the base of the cabinet and the fixing hole of the base expansion bolt are shown in Figure .


2.3 Cabinet fixing

( 1 ) According to the hole position map or the scribe template of the cabinet base, the base expansion bolt hole of the cabinet is punched with a hammer drill in advance, and the diameter of the hole is referenced to the size of the expansion bolt;

( 2 ) First, fix the leftmost or rightmost first cabinet with expansion bolts, place the remaining cabinets one by one, and finally fix the cabinets with the expansion bolts.

( 3 ) If you need to seal the base of the cabinet, use the base sealing plate (optional) to seal the notch and hole around the base. The mounting screws are the M5 stainless steel screws in the cabinet attachment (see Figure 5 ).

Note: If the cement foundation is not flat, it is recommended to use a gasket or spacer to level the base of the cabinet.

Figure 5


Note: When crossing the wire loop, first cut the cross with a utility knife. After the cable is connected, seal the remaining gap on the wire loop with the sealing glue attached to the cabinet.,As shown below;


image:


Diagram:

China 20U 19 Thermostatic Sandwich Outdoor Electrical Cabinet With Emerson Power System supplier

20U 19" Thermostatic Sandwich Outdoor Electrical Cabinet With Emerson Power System

Inquiry Cart 0