Gas Cleaning System In Iron Making Plant

Brand Name:AUSTIN FILTER
Certification:ISO9001-2008
Model Number:SXMMCC3500
Minimum Order Quantity:1 sets
Delivery Time:30-60 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Address: 30-2, LiDe Enterprise Home, No. 888, Pengqing Road, Kunshan, Jiangsu, China
Supplier`s last login times: within 31 hours
Product Details Company Profile
Product Details

250-5000m3 blast furnace dry gas cleaning bag filter dedusting system in iron making plant


In China, we have more than 1000 sets blast furance for iron making in the first step.All of them choose dry GCP system to filtering the high temperature gas and recyle to other units plants, like hot stoves, steel making plant and so on.


The advantage of blast furnace dry gas cleaning dust collector system


After production stabilization, the pressure of the dust silo is controlled in the range of 2Kpa-3Kpa


Dust content after cleaning is stabilized less than 5mg/Nm3 for long time.


Annual average TRT capacity per ton of hot metal can reach 53kWh, which is 45% more than wet GCP.


Zero water consumption


Total fresh water consumption of wet GCP is saved, it will save 0.7-0.8m3 fresh water per Ton

Low power consumption


98.5% of annual power consumption of wet GCP is saved, and at the same time, the tension of local load can e eased through TRT power generation.


TRT power generating capacity is increased


Loss of gas pressure is low, temperature is high and dust content is low after dry GCP and the capacity of TRT power generating is increased by 45% compared with wet GCP.


Increase the hot stove temperature


Clean gas after dry GCP has higher calorific valve and lower water content, this help to increase the temperature of hot stove, and realizes long term stabilization of temperature at 1300 degree, meanwhile, greatly reduce emission of CO2.


Low emission of dust


Operation of overall equipment of dry GCP is safe and stable, dust content after cleaning less than 5mg/Nm3, Collected ash is conveyed and dumped in fully enclosed manner without discharging.



SXMMCC3500SXMMCC4000SXMMCC5200SXMMCC6000SXMMCC6400
Media

BF gas



BF gas


BF gas


BF gas


BF gas

Gas volume per silo(m3/h)15000-2400017430-2789020340-4068025520-5105032526-65052
Operation temperature250-350250-350250-350250-350250-350
Filter bag per silo205237396496556

Bag size(mm)

Dia130X6000Dia130X6000Dia130X7000Dia130X7000Dia130X7000
Filtration area(m2)499.9581113014181807
Velocity (m/m)0.3-0.60.3-0.60.3-0.60.3-0.60.3-0.6

pressure

<2000<2000<2000<2000<2000
Inlet dust density g/Nm3<10<10<10<10<10
Outlet dust density mg/Nm3<5<5<5<5<5
Efficiency %>99.9%>99.9%>99.9%>99.9%>99.9%
Pulse pressure Mpa0.2-0.40.2-0.40.2-0.40.2-0.40.2-0.4
Pulse time(S)0.20.20.20.20.2

outer

dimension

Dia 3524X16000Dia 4024X16300Dia 5228X 21500Dia 6032X22500Dia 6436X23500

Ash conveying

mechanical pneumaticmechanical pneumaticmechanical pneumaticmechanical pneumaticmechanical pneumatic

We are now start our design in wet to dry GCP system, the professional team will help you on 250-5000m3 blast furnace wet GCP to dry GCP design, installation and operation.


China Gas Cleaning System In Iron Making Plant supplier

Gas Cleaning System In Iron Making Plant

Inquiry Cart 0