Track Water Well 350mm Borehole Drilling Machine Cwd300t

Brand Name:JCDRILL
Certification:CE, ISO
Model Number:CWD300T Track Borehole Water Well Drilling Machine
Minimum Order Quantity:1 set
Delivery Time:30-45 days
Payment Terms:L/C, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Beijing Beijing China
Address: Room 1407,BuildingA,No.13,Beiyuan Road,Chaoyang District,Beijing,China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Track Borehole Water Well Drilling Machine CWD300T


>> Introduction


CWD300T crawler mounted drilling rig can drill in all kinds formations by mud drilling in doft formation and air DTH hammer in rock drilling,DTH hammer is applied in rock drilling,slag is discharged by air pressure and the offstage efficiency is ten times than traditional rotary drilling.


>> Characteristic
>> The drilling rig can use air DTH hammer drilling and mud drilling.
>> Centrailzed control console is suitable for each manipulation and control.Rapid pullng and lifting reduce the auciliary time and enhance the work efficiency.
>> The main drive system,the transfer case,gearbox,double-winch units,mud pump,turntable,drilling tower,feed system are set up on the chassis.
>> It is a hydraulic rotary drilling rig with directional circulation.It can be equipped with BW450 mud pump which adapts the slurry as the sashing fluid and can drill on clay,sand and rock if it is equipped with suitable drilling bit.
>> The power of drilling rig comes from a Yuchai engine ,80kw Yunnei engine drives the large displacement high pressure plunger pump and it is charactertized by powerful dynamic and stable performance.

>> Specification

SpecificationUnitCWD300T
Geology drilledAll Kind
Drilling TypeDTH & MUD
Drill system and operationHydraulic
Hole DiametermmΦ90—Φ350
Hole Depthm300
Rotation TorqueNm5000-6500
Rotation Speedrpm70-140
Drill pipe diametermm76/89/102
Drill pipe lengthmm6000
Max. Feed SpeedM/min60
Max. Lifting SpeedM/min30
Feed Strokemm6600
Max. Pull back CapacityT16
Lifting force of WinchT1.5
Engine
Diesel Engine type4Cylinder,water cooling
Diesel Engine BrandYUNNEI
Rated Horse powerKw80
Compressor required(Optional)
Pressure RequiredMpa15-30
Air consumptionm³/min1.5-2.5
Mud Pump(Optional/Separate or on board)
ModelBW450
DisplacementL/Min450
Discharge pressure (Mpa)Mpa2
Dimension
Net WeightKgs7000
Transportation dimensionmm5650*1700*2260
Work Dimensionmm3550*2660*9350
Ground Clearancemm305

>> Package & Delivery

>> Our Service

>> Pre-sale service

Acting as a good adviser, our well-trained sales groups and professional technical team propose most rational solutions for our valued client as per practical project requirement.

>> Select suitable model & matched equipment.

>> Strong technical support. Reply clients' questions within 24 hours.

>> Service During Sales

We have responsible team from raw material to finished products, and guarantee 100% pass rate.

>> Design and manufacture products basis of client's special equirement

>> Inspect each machine & matched accessories strictly before delivery

>> Timely inform client of production progress.


>> After Sales Service

We're always with you in after-sale service.

>> We can arrange related after-sales representatives for debugging and training at worksite when starting up. >> E-mail, call or door-to-door service in later using.


>> Overseas Service&Project

>> FAQ

Q: Are you original manufacturer?


Q: Which payment terms are available to us?Q: Which Incoterms 2010 terms can we work?
A: Yes, we JCDRILL is a official leading manufacture in drilling machinery in China and we have the whole series products you need.A: T/T term or L/C term. On T/T term, 30% down payment is required in advance, and 70% balance shall be settled before shipment. On L/C term, a 100% irrevocable L/C without "soft clauses" can be accepted.A: We JCDRILL are a professional and international company, accept all Incoterms 2010 terms, normally we work on FOB, CIF, CFR, CIP.
Q: How long will the delivery time take?Q: How about after sales service?Q:Spare Parts When You Need Them
A: Normally products will take about 3-15 days to produce the ordered machines. Most of the time, we can have an immediate delivery of our regular machines in 15 days.A: 365×24 Year-round Service We are committed to year-round 24-hour service even during holidays, in line with our policy of always providing "a response within 15 minutes and job completion within 24 hours."A:We have spare parts centers across continents that stock specialist spare parts. We promise that spare parts will be delivered within 72 hours or no more than one week.

>> Related Products

China Track Water Well 350mm Borehole Drilling Machine Cwd300t supplier

Track Water Well 350mm Borehole Drilling Machine Cwd300t

Inquiry Cart 0