Portable Current Transformer Test Set Output 1A 0.5A 0.3A Transformer On Load Tap Changer Tester

Brand Name:GDZX
Certification:ISO9001
Model Number:ZXYZ-2000
Minimum Order Quantity:1
Payment Terms:L/C, T/T, Western Union, MoneyGram
Place of Origin:CHINA
Contact Now

Add to Cart

Verified Supplier
Location: Wuhan Hubei China
Address: No.1 Fenghuangyuan Second Road, Jiangxia District, Wuhan City, Hubei Province, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details


Portable Output 1A 0.5A 0.3A Transformer On Load Tap Changer Test Equipment


This Tester Is Mainly Used To Measure The Transformer On-Load Tap-Changer Transition Waveform, Transition Time, The Instantaneous Transition Resistance, Three-Phase Synchronization And So On.

The Instrument Features Highly Intelligent, English Menu Prompts, Simple Operation. Instrument Small Size, Light Weight, Strong Anti-Interference Ability. It Is Ideal Instrument To Ensure Safe Production And Good Quality In Power Plants Units, Transformer Manufacturing Industry.

Features

1. Large output current, light weight.

2. Open circuit voltage 28V, 1A gear for testing 10Ω transition resistance, 0.5A, 0.3A for larger transition resistance.

3. Perfect protection circuit, reliable to use.

4. Vertical chassis structure, 5.7-inch large LCD display, easy site operation.

5. U disk storage function

Technical Indicators

Output current1.0A, 0.5A, 0.3A gears
Resistance range1.0A: 0.1 ~ 10Ω; 0.5A: 5 ~ 20Ω; 0.3A: 10 ~ 40Ω.
Resistance measurement accuracy± (reading × 5% + 5 words), resolution: 0.01Ω
Transition time measurement range1 ~ 250mS
Transition time measurement accuracy± 1mS, resolution: 0.1mS
Sampling frequency10K
StorageU disk storage, local storage
Operating temperature-20 ℃ ~ +50 ℃
Environmental humidity≤ 90% RH, no condensation
Working powerAC220V ± 10%, 50Hz ± 10%



Matters needing attention during operation
1. Before use, the ground terminal of the instrument must be connected to the ground wire.
2. During the test, it is not allowed to remove the test wire.
3. When testing with windings, the non-test terminal of the transformer should be three-phase short-circuited to ground.
4. If you choose to store data in a USB flash drive or query the stored data in the USB flash drive, please insert the USB flash drive into the "U flash drive interface", and it is not allowed to remove the USB flash drive while storing or querying data to the USB flash drive.


China Portable Current Transformer Test Set Output 1A 0.5A 0.3A Transformer On Load Tap Changer Tester supplier

Portable Current Transformer Test Set Output 1A 0.5A 0.3A Transformer On Load Tap Changer Tester

Inquiry Cart 0