Home /Steel Structures /

Long Span Horse Shed Steel Structure Construction For New Zealand Waikato

Long Span Horse Shed Steel Structure Construction For New Zealand Waikato

Brand Name:KAFA
Certification:ISO 9001
Model Number:Steel Building 02
Minimum Order Quantity:50T
Delivery Time:45 days after deposit
Place of Origin:Qingdao, China
Contact Now

Add to Cart

Verified Supplier
Location: Qingdao Shandong China
Address: Dazhushan Industrial zone , Huangdao District, Qingdao City.
Supplier`s last login times: within 24 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details


New Zealand Waikato Horse Shed Steel Structure Construction

  • Project name: New Zealand Waikato Horse Shed

  • Supply scope: steel frame, Roof system

  • Steel quantity: 56 tons

  • Contract value: 60,000usd

  • Dimension: 30mL*40mW*6mH

  • Roof system applys 0.5mm thickness color steel sheet and skylight sheet.



>>Specification

ItemMaterials CharacteristicsMaterial GradeSurface Treatment
Steel ColumnH shape,Box,Steel PipeQ235B,Q345BPaint or Hot dip Galvanized
Steel beamH shape,Box,Steel PipeQ235B,Q345BPaint or Hot dip Galvanized
Steel BracingSteel Rod,Steel Pipe,Angle SteelQ235B,Q345BPaint or Hot dip Galvanized
Steel PurlinC or Z purlins(Thickness1.8mm~3.0mm)Q235B,Q345BHot dip Galvanized
External Wall panels,Roof panelsSingle colorful corrugate steel sheet,sandwich panels with EPS,Rock wool,PU insulationGalvanized Steel+PaintingAlu-zinc 150g,Fluorocarbon paint
Steel buildings DoorSliding door or Rolling doorSteel or Aluminum sheetPaint or Hot dip galvanized
Steel buildings WindowsAluminum alloy-Glass,Aluminum alloy-shutterT=1.0-2.0mmAlloy
Skylighting panelsFRP T=1.5mm-1.8mmCoefficient of thermal expansion:2.2x10-5/cmLight Tranmitar 85%
VentilatorTurbine ventilator on a ridgeSteel,Stainless steel, PCPaint or Hot dip Galvanized
GutterGalvanized steel plate,Stainless steel plateT=2.0mmHot dip galvanized
Down pipePVC pipe,color steel pipe Y=0.5mmDia110mm
FastenersHigh strength bolt, Ordinary bolt10.9S,4.8SBlack, galvanized
Anchor boltsM24,M27,M30,M33,M39,M42Q235ASteel


>>Advantage

Fast construction

Steel structure members are pre-welded, pre-drilled and pre-punched in our factory. Only need to connect by bolts with the accuracy of steel components, no need weld on construction field.
Only need 5 workers to assemble one steel structure building of 1000 sqm within 25 days.

Affordable costRequire less maintenance than concrete building. Averagely, it cost about 50% less than traditional construction. Moreover, 98% of all steel structure can be recycled into new steel products without reducing physical properties.
Anti-seismic and wind resistanceCan withstand grade 8 earthquake, wind resistance 300km/h.
Long service timeMore than 50 years.
Health and safetySteel structure building is manufactured at the factory and rapid installation on the construction site by skilled personnel making steel structure safe. There is very little noise and dust.


FAQ:


What is the steel materials for main frame

We apply high strength steel grade Q355B for the main frame components, which ensure the strong and durable of the prefabricated metal structure buildings.


Why Prefab Metal Buildings lower than the concrete building

The materials of metal structure building higher than the concrete structure, but the prefab metal building fast and simple construction, the labor cost during installation, which much lower, so the overall cost of prefab metal structure building more economical than the concrete building.

China Long Span Horse Shed Steel Structure Construction For New Zealand Waikato supplier

Long Span Horse Shed Steel Structure Construction For New Zealand Waikato

Inquiry Cart 0