15000psi Hydraulic Adjust Drill Spare Parts Petroleum Equipment 35Mpa Pressure

Brand Name:TR Solids Control
Certification:API
Model Number:JG-35
Minimum Order Quantity:1 pc
Delivery Time:Within 30 days after deposit
Payment Terms:L/C, D/A, D/P, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Address: No.10 West of North Second Rig, Weiyang District, Xi’an City, China
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

China Wholesale Price 15000psi Hydraulic Adjust Choke Manifold Petroleum Equipment


Choke Manifold


Application


Choke manifold is a necessary device in the process of blowout control and implementation of oil and gas pressure control technology. In case that the BOP is off, the pressure at the bottom of well shall be kept higher than formation pressure through controlling casing pressure with choke valve on-off. Additionally, soft shut-in can be realized through relieving pressure with choke manifold in the process of well shut-in. When pressure in well rech at extreme limitation,it can be used to prevent blowout and protect wellhead.


Configuration


Our choke manifold is composed of choke valve, gate valve, pipeline, pipe fittings and pressure gage, etc.


Working Principle


When well pressure rises, the choke valve (it falls into three kinds: Manually adjustable, hydraulic and positive) on choke manifold can be turned on and off to release the fluid to control casing pressure. Gate valve can be used for direct blowout. When casing pressure is pretty high,

The pressure class of our company's chokes manifold falls into five class: 14MPa, 21MPa, 35MPa, 70MPa and 105MPa. Also, we can design according to customer demand.


Operating Instructions

  1. The pressure gauge must be installed.
  2. In winter, the choke manifold can work under a low temperature condition.
  3. The working pressure of all components on the choke manifold shall be compatible with that of the BOP stack used.
  4. The choke manifold shall be installed at the place where the operator can reach it easily. The pressure test must be performed prior to installation and the seat test pressure shall be equal to the rated working pressure.
  5. The line pipe shall be level and straight as much as it could. In case of the turn of the line pipe, the 120 degree steel bent pipe shall be used. The bore of the line pipe shall be large enough.


Technical Specification of Our Choke Manifold:


Design Pressure
Size
Dimensions L X W X H
Configuration
psi
inch
inch
5 x Manual Valves
1 x Adj.Choke & 1 x Pos. Choke
1 x Data-header
5000
3.1/16"
90.9 x 89.6 x 32.5
8 x Manual Valves
1 x Adj.Choke & 1 x Pos. Choke
1 x Data-header
5000
4.1/16"
76 x 108.9 x 74.0
4 x Manual Valves
1 x Adj.Choke & 1 x Pos. Choke
2 x Data-header & 1 x Lifting Arm on Skid
10000
3.1/16"
99.9 x 151.0 x 39.44
8 x Manual Valves
1 x Adj.Choke & 1 x Pos. Choke
1 x Data-header
10000
4.1/16"
108 x 178.25 x 46.0
8 x Manual Valves
1 x Adj.Choke & 1 x Pos. Choke
1 x Data-header
15000
3.1/16"
177 x 175 x 44.61
6 x Manual Valves
4 x Pos. Choke
2 x Skids
15000
4.1/16"
103.5 x 161.9 x 58.5
2 x Hyd.Valves & 6 x Man. Valves
1 x Adj.Choke & 1 x Pos. Choke
1 x Data-header
15000
4.1/16"
96 x 175.0 x 72.2
8 x Manual Valves
1 x Adj.Choke


Competitive Advantages


1. We offer high quality products at competitive price.
2. Shortest delivery time.
3. Flexible payment terms.
4. Timely after-sale service.
5. Most of our equipment can be replaceable with international brands.
6. Our products have been exported to Argentina, Egypt, US, Australia, Romania, Pakistan, Dubai, Abu Dhabi, Iran, India, Indonesia, Vietnam, Malaysia and many other countries.


Company Tenet


Customer's satisfaction is the highest pursuit of TR Solids Control.


China 15000psi Hydraulic Adjust Drill Spare Parts Petroleum Equipment 35Mpa Pressure supplier

15000psi Hydraulic Adjust Drill Spare Parts Petroleum Equipment 35Mpa Pressure

Inquiry Cart 0