200000 cph LED mounting machine

Brand Name:ETON
Certification:CCC CE SIRA
Model Number:HT-F9
Minimum Order Quantity:1
Delivery Time:30 days after pay
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Verified Supplier
Location: Shenzhen Guangdong China
Address: HENGFENG INDUSTRIAL AREA,ZHOUSHI ROAD NO. 739,HEZHOU COMMUNITY,HANGCHENG STREET,BAOAN,SHENZHEN,CHINA
Supplier`s last login times: within 48 hours
Product Details Company Profile
Product Details

200000 cph LED mounting machine


The placement speed of the SMT placement machine determines the production capacity of the placement machine and the production line, and is an important limiting factor for the production capacity of the entire production line. So how is the actual placement speed of the SMT placement machine calculated?


SMT placement machine placement cycle


The placement cycle is the most basic parameter that marks the placement speed. It refers to the time it takes from picking up the component, after detection, placing on the PCB, and then returning to the position of the picking component. Each time such a trip is performed, a placement operation is completed, that is, a placement cycle is completed. Generally, the placement cycle of Chip components in high-speed machines is within 0.2 s, and the highest placement cycle is currently 0.06-0.03 s;-the placement cycle of QFP is generally widely used machine placement is 1 ~ 2 s, placement The placement cycle for chip components is 0.3 to 0.6 s.


SMT placement machine placement rate


The mounting rate refers to the number of components mounted in 1 h, and the unit is c/h. The placement rate is the placement speed measured by the placement machine manufacturer under ideal conditions. The calculation of the theoretical speed does not consider the PCB loading and unloading time, the placement distance is the closest, and only a small number of components (about 150 chip components) are placed, and then the time taken to mount one component is calculated, and the 1 h placement is calculated from this Quantity.


Auxiliary time on SMT production line


1. PCB loading/unloading time, usually 5 ~ 10 s for placement machine.

2. The components on the large (rectangular) PCB are far apart, and the placement time will be extended.

3. Refueling time.

4. Machine maintenance time (days/weeks/months), this is the advantage of good quality SMT placement machine. Good quality, non-failure SMT placement machine can reduce machine maintenance time.

5. Unpredictable downtime.


Eton HT-F9 High speed machine


ETON HT-F9 is the newest machine for mounting led tube, panel, strip light.

The speed reach 200000 chip per hour.


Service


If you buy our machine, we support one year warranty and free install and traning.


Contact


Joy:+8613590151025

Emil: joy@eton-mounter.com

China 200000 cph LED mounting machine supplier

200000 cph LED mounting machine

Inquiry Cart 0