3 Phase 4 Wire Portable Load Bank Testing Equipment 400 VAC ISO Approved

Brand Name:KAIXIANG
Certification:ISO9001
Model Number:500KVA
Minimum Order Quantity:ONE SET
Delivery Time:ONE MONTH AFTER GET DEPOSIT
Payment Terms:L/C, D/A, D/P, D/P, T/T, Western Union, MoneyGram, D/P
Contact Now

Add to Cart

Active Member
Location: Shijiazhuang Hebei China
Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

High Voltage Data Center AC Dummy 500KVA Load Bank With Wheel

Product Description

load banks are devices which contain resistive,inductive and/or capacitive loads,apply the load to an electrical power source and dissipate the power of the electrical source .unlike the on-site loads which are randomly variable in terms of many electrical parameters ,load banks provide predetermines and controllable load which serves power source usings energy output to test,support or protect the power source

Technical Parameters

Rating Voltage/Frequency400VAC/50Hz, 3 phase 4 wire,
Rated Load PowerResistive load: 500KVA
Installed CapacityResistive load: 500KVA
Load Step

Resistive:1,2,2,5,10,10,20,50,100,200kW
Reactive:1.2.2.5.10.10.20.50.100.100kvar

PF(Power Factor)1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power380VAC/50Hz, 3 phase 4 wire,
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——Connector-bar

InsulationF
Duty CycleContinuous
Casing Dimensions and Coolingabout 1680*2400*1440mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air
WeightAbout 2100kgs/set
TransportationHoisting, there are lifting lug in top of casing
Casing ColorGrey(RAL7035)
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤1500 meter
Atmospheric Pressure86~106kPa
ContactorSchneider
FuseDELIXI
MCUINFINEON
Data processing softwareKaixiang(self-developed)
Alloy ResistanceKaixiang(self-developed)


Product Advantage

1. User can press the emergency stop button in the panel to unload immediately when the load bank is abnormal while working.
2. Over-load: Automatic load dump and give alarm when voltage is over safety thresholds.
3. Short Circuit Protection: Fuse could avoids damage to equipment when short circuit or current overload.
4. Fan protection: Machine could not do load testing before working power of fan is on.

Application

Manufacturers of small gas engines also use load banks to test newly manufactured engines under various mechanical loads. This is accomplished by connecting the engine to the load bank via a device called a dynamometer. Again, engine performance is monitored and, if necessary, adjustments are made to ensure the product performs within intended specifications.























China 3 Phase 4 Wire Portable Load Bank Testing Equipment 400 VAC ISO Approved supplier

3 Phase 4 Wire Portable Load Bank Testing Equipment 400 VAC ISO Approved

Inquiry Cart 0