500KW 3 Phase Load Bank , Electrical Load Testing Equipment Continuous Working

Brand Name:KAIXIANG
Certification:ISO9001
Model Number:AC400-500KW
Minimum Order Quantity:ONE SET
Delivery Time:ONE MONTH AFTER GET DEPOSIT
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Location: Shijiazhuang Hebei China
Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

Safety Monitoring Variable 500KW 3 Phase Load Bank Continuous Working

Product Description

1.Load testing: load power that not beyond the rated power, testing and display stable state 3 phases voltage, current, active power, frequency, working time, etc of generator sets.
2.Load/unload with one key:Either by manual control or software control, user can preset the power, then press load master button. Load bank loaded according to preset power to avoid load fluctuation during the power changing.
3.Control Pattern: user can choose local control and intelligent control.

Technical Parameter

Rating Voltage/Frequency400VAC/50Hz, 3 phase 4 wire,
Rated Load PowerResistive load: 500kW
Installed CapacityResistive load: 500kW
Load Step1,2,2,5,10,10,20,50,100,100,200kW
PF(Power Factor)1
Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control Power380VAC/50Hz, 3 phase 4 wire,
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——terminal block

InsulationF
Protection GradeIP21
Way of WorkingContinuous Working
Casing Dimensions and Coolingabout 1550*1250*1680mm (length*width*height) Forced air cooling,Horizontal inlet air,Vertical cooling
WeightAbout 750kgs/set
TransportationHoisting, there are lifting lug in top of casing
Casing ColorGrey(RAL7035)
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤1500 meter
Atmospheric Pressure86~106kPa
ContactorSchneider
FuseDELIXI
MCUINFINEON
Data processing softwareKaixiang(self-developed)
Alloy ResistanceKaixiang(self-developed)


Product Advantage

User could load any power within rated power, can test stable state three-phase voltage, current, active power, apparent power, power factor, frequency, running time of generating set.
Whether load/unload by manual control panel or by PC software control, user can pre-set the power then press the master load button.
Control mode: user can choose local manual control or Intelligent control(PC control)

Application

Manufacturers of small gas engines also use load banks to test newly manufactured engines under various mechanical loads. This is accomplished by connecting the engine to the load bank via a device called a dynamometer. Again, engine performance is monitored and, if necessary, adjustments are made to ensure the product performs within intended specifications.



















China 500KW 3 Phase Load Bank , Electrical Load Testing Equipment Continuous Working supplier

500KW 3 Phase Load Bank , Electrical Load Testing Equipment Continuous Working

Inquiry Cart 0