

Add to Cart
250KVA Inductive Load Bank With 86 ~106 KPa Atmospheric Pressure
Product description
1. System consists of testing/control and load bank, mainly
includes AC load bank, data capture system, auto load/unload
control system, heat dissipation device, assist control and PC
software.
2. User can control load bank through local control panel, also
through software
Technical Parameter
Rating Voltage/Frequency | 415VAC/50Hz, 3 phase 4 wire, |
Voltage range | 380v 50hz ±10% |
Max Rated power | Apparent Power: 670kVA |
Load Resolution | Resistive load:1.2.2.5.10.10.20.50.100kw |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | AC380VAC/50Hz,3 phase 4 wire |
Wire Connection | Load power supply input——Copper bar (star coupling) |
Communication Interface | RS485, |
Casing Dimensions and Cooling | about 2400*1400*1680mm (length*width*height) Forced air cooling,Horizontal inlet air,Vertical cooling |
Weight | About 1000kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
This system, which is of independent research and development of
electricity load test equipment by our technology, combining dry
load module with the automatic measurement and control module, can
accurately detect all kinds of generator output power and load
capacity, full load and overload test.
Application
Motor manufacturing: The load bank is an ideal test equipment for
generator power ,the frequency,the voltage,the current,power factor
and other generator parameters.Most of the generator use the diesel
oil,which can cause the fuel oil unfilled,carbon deposition
,complete machine efficiency reduced when the diesel oil load is
lower than 50% or in idling situation for a long time and even
cause starting difficulty ,power insuffciency,oil consumption
increased,finally,opening the cylinder for maintenance too early
and the abandonment ,so the load bank will be generator's ideal
false load