250KVA Programmable Load Bank 3 Phase 4 Wire Electrical Load Bank For Industry

Brand Name:KAIXIANG
Certification:ISO9001
Model Number:AC400-250KVA
Minimum Order Quantity:1 set
Delivery Time:Within 30 working days
Payment Terms:L/C, D/A, D/P, T/T, Western Union, MoneyGram
Contact Now

Add to Cart

Active Member
Location: Shijiazhuang Hebei China
Address: No33 Wangshan Road, Green Island Economic Development Zone, Shijiazhuang, China
Supplier`s last login times: within 1 hours
Product Details Company Profile
Product Details

250KVA Inductive Load Bank With 86 ~106 KPa Atmospheric Pressure

Product description


1. System consists of testing/control and load bank, mainly includes AC load bank, data capture system, auto load/unload control system, heat dissipation device, assist control and PC software.
2. User can control load bank through local control panel, also through software


Technical Parameter


Rating Voltage/Frequency415VAC/50Hz, 3 phase 4 wire,
Voltage range380v 50hz ±10%
Max Rated power

Apparent Power: 670kVA
Resistive Power: 200kW
Reactive Power: 150kvar

Load Resolution

Resistive load:1.2.2.5.10.10.20.50.100kw
Reactive load: 1.2.2.5.10.10.20.50.50kvar

Load Tolerance (each step)±5%
Load Tolerance(overall)±3%
Display Precision0.5 class
Control PowerAC380VAC/50Hz,3 phase 4 wire
Wire Connection

Load power supply input——Copper bar (star coupling)
Control power supply input——Terminal Block

Communication InterfaceRS485,
Casing Dimensions and Coolingabout 2400*1400*1680mm (length*width*height) Forced air cooling,Horizontal inlet air,Vertical cooling
WeightAbout 1000kgs/set
TransportationHoisting, there are lifting lug in top of casing
Casing ColorGrey(RAL7035)
Ambient Temperature-10℃~+50℃
Relative Humidity≤95%
Altitude≤1500 meter
Atmospheric Pressure86~106kPa
ContactorSchneider
FuseDELIXI
MCUINFINEON
Data processing softwareKaixiang(self-developed)
Alloy ResistanceKaixiang(self-developed)


Product Advantage

This system, which is of independent research and development of electricity load test equipment by our technology, combining dry load module with the automatic measurement and control module, can accurately detect all kinds of generator output power and load capacity, full load and overload test.

Application

Motor manufacturing: The load bank is an ideal test equipment for generator power ,the frequency,the voltage,the current,power factor and other generator parameters.Most of the generator use the diesel oil,which can cause the fuel oil unfilled,carbon deposition ,complete machine efficiency reduced when the diesel oil load is lower than 50% or in idling situation for a long time and even cause starting difficulty ,power insuffciency,oil consumption increased,finally,opening the cylinder for maintenance too early and the abandonment ,so the load bank will be generator's ideal false load

China 250KVA Programmable Load Bank 3 Phase 4 Wire Electrical Load Bank For Industry supplier

250KVA Programmable Load Bank 3 Phase 4 Wire Electrical Load Bank For Industry

Inquiry Cart 0