Add to Cart
600kw Loadbank Testing Equipment for Generator Power load Bank Made
in China
Product Description
1.Supply most robust, high-capacity designs
2.intelligent operator controls,safety indication layouts,
adjustable load step resolution, and lightweight designs
3.solution for regularly scheduled maintenance testing and
commissioning of mission-critical standby emergency power systems
Technical Parameters
Rating Voltage/Frequency | 400VAC/50Hz, 3 phase 4 wire, |
Rated Load Power | Resistive load: 600kW |
Installed Capacity | Resistive load: 600kW |
Load Step | 1,2,2,5,10,10,20,50,100,200,200kW, min step load: 1kW |
PF(Power Factor) | 1 |
Load Tolerance (each step) | ±5% |
Load Tolerance(overall) | ±3% |
Display Precision | 0.5 class |
Control Power | 380VAC/50Hz, 3 phase 4 wire, |
Wire Connection | Load power supply input——busbar |
Insulation | F |
Duty Cycle | Continuous |
Casing Dimensions and Cooling | about 1550*1250*1680mm (length*width*height) Forced air cooling,Horizontal inlet air,Horizontal outlet air |
Weight | About 750kgs/set |
Transportation | Hoisting, there are lifting lug in top of casing |
Casing Color | Grey(RAL7035) |
Ambient Temperature | -10℃~+50℃ |
Relative Humidity | ≤95% |
Altitude | ≤1500 meter |
Atmospheric Pressure | 86~106kPa |
Contactor | Schneider |
Fuse | DELIXI |
MCU | INFINEON |
Data processing software | Kaixiang(self-developed) |
Alloy Resistance | Kaixiang(self-developed) |
Product Advantage
System can load power in rated range, measure generator
steady-state 3 phase voltage, current, active power, power factor,
frequency, and running time, and simulate the generator set, UPS
real load working state. Power input using sectional type, energy
dissipation type load, forced-air cooling, 3 phase fan
decentralized supply air, air-flow is sufficient and low noise.
Application
Manufacturers of standby power generators commonly use load banks
to test and tune newly assembled units. When the generator has been
set up in a test cell within the factory, a test engineer uses the
load bank to apply a discrete, selectable electrical load to the
generator and measure the response stability and endurance. During
this process, the test engineer calibrates and adjusts the
generator performance to ensure it meets the intended product
specifications and tolerances.