260m Large Pneumatic Crawler Mounted Drilling Rig 77kw For Water Well Drilling Work

Brand Name:SHITAN
Certification:ISO
Model Number:ST260
Minimum Order Quantity:1 Set
Delivery Time:5-8 days after payment
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

ST 260 Water Well Drilling Rig Large Pneumantic Machine


ST 260 Water Well Drilling Rig Product Description


ST-260 drilling rig is especially suitable for water intake in mountainous and rocky strata.Pneumatic water well drilling machine should be used together with air compressor, it can add mud pump and foam pump. Need to use different drilling tools such as: drill rod, hammer, rock drill bits, etc.If you want to buy an air compressor at the same time, please tell us your drilling depth and diameter, and we will give the corresponding recommendation


ST 260 Water Well Drilling Rig Technical Information


Drilling Depth260m
Dia.holeφ105-260mm
Advance Length one time6.6m
Working pressure1.7-3.0MPa
Air consumption17-35m³/min
Length of rod1.5m,2m,3m,6m
Dia. Of rodφ76, φ89,φ102,φ114
Lifting power24T
Rotation torque8500-11000N.m
Rotation Speed40-70r/min
Diesel EngineYuchai
Engine Power85Kw/2200rpm
Travelling speed0-2.5 Km/h
Climb capacity30°
Weight9000kgs
Dimension5900x2000x2850mm
ApplicationComplicated geological conditions:Rock,Mud,Sand etc.
Drilling WayTop drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer4",5",6",8" Drill hammer or CIR110, 130, 150,170

Product Advantages


This is a high efficiency and multi-functional down the hole water well drilling equipment, It can be used to drill water well, agrecultural irrigation well, geothermal well and other type well holes. It is sepcial suitable for mountain area and rock stratum water sourcing project.

system. The brand diesel is protected by 2 levels air filtration systems and also can directly use the clean air from the air compressor.

The pneumatic drilling rig is multifunction, with different configurations suitable for different geologies.Accept customization,any good ideas please contact us, our engineers will help you get what you want, we can also put the platform on a truck mounted chassis


What can we do for you?


Q: Are you original manufacturer? A:Yes, we are a manufacturer in construction machinery and we have the whole series products

Q: What kind terms of payment can be accepted? A:Normally we can work on T/T.

Q: What about the delivery time? A:7 days after receiving the deposit.

Q: What about the warranty time? A:12 months after shipment,engine is 6 months.

Q: What about the Minimum Order Quantity? A:The MOQ is 1 set.

Q: Could you stick customers brand on the products? A: We warmly welcome the OEM orders.


Courtyard Drilling Attentions


1. Consider whether the well depth is reasonable

We should first investigate whether there are cables, sewers and other facilities under the ground, and avoid unnecessary damage.

2. Convenience, health and other issues should be considered.

After drilling the well, find some charcoal and throw it into the well with a bag and press it at the bottom of the well to absorb foreign toxins. After having water, you can put a few small fish down, which is a good way to test the safety of water quality.

3. The well should not be too deep. It should be above the ground and should be blocked with bricks and stones. It is better to have a cover, so as to prevent dirt from falling in, make people feel safer and avoid unnecessary dangers.


Water Well Drilling Work Attentions


1. The drilling unit must first drill holes, take samples and draw the drilling profile structure diagram (histogram).

2. According to the histogram: geological structure, the upper pipe and filter pipe of the well shall be made, and the drilling diameter shall not be less than 300mm.

3. After the well is drilled and the pipe is laid, the backfilling amount of filler shall be 1.8-2.0 m3, and it must be ensured that the outside of the well pipe wall is more than 70 mm. The filter material is siliceous sandy pebble without impurities. It is better to mix according to the pebble particle size (20-40mm). During filling, materials shall be fed layer by layer manually. It is strictly prohibited to backfill filter materials mechanically and soil into the well. Gravel filling method: generally, circulating water or still water is used for gravel filling. If the filling quantity and height of filter material are greatly different from the plan, find out the reasons, deal with them properly, and record the filling results.

4. After well completion, the well pipe shall be vertical and not inclined.

5. The polyethylene plastic pipe wall of the well pipe is 8mm thick. The well pipe adopts a drilling filter. The drilling hole is 18-20mm, and the drilling rate is not less than 25%. The well pipe shall be overlapped and the filter screen shall be fixed. Screw joint is adopted for well pipe lapping and drilling φ 8mm hole, mounting φ 10mm screw. The mesh of the filter screen is about 25 mesh, and the filter screen is wrapped in 2 layers.




China 260m Large Pneumatic Crawler Mounted  Drilling Rig 77kw For Water Well Drilling Work supplier

260m Large Pneumatic Crawler Mounted Drilling Rig 77kw For Water Well Drilling Work

Inquiry Cart 0