72kw Pneumatic Drilling Rig Commercial Industrial Rock Drilling

Brand Name:JINZHOU SHITAN
Certification:ISO
Model Number:ST 200
Minimum Order Quantity:1 set
Delivery Time:7-10 days
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

ST 200 Pneumatic Water Well Drilling Rig Machine For Large Borehole Blasting


ST 200 Water Well Drilling Machine Introduction

The drill rig has more positive speed stages and 14-500r / min speed range, and the output torque is 13428-250N.m.The drilling rig has 2 reverse speeds, which is convenient for handling accidents.The water well drilling rig rig uses dual oil pumps for oil supply. A single pump is used for drilling, and a double pump is used for confluence when lifting. The power loss is small and the auxiliary time is short.. The drilling rig machine has advanced structure and reasonable layout, which is convenient for maintenance, maintenance and repair.


ST 200 Water Well Drilling Machine Technicals


Drilling Depth200m
Dia.holeφ140-200mm
Advance Length one time6.6m
Working pressure1.7-3.0MPa
Air consumption17-35m³/min
Length of rod1.5m,2m,3m,6m
Dia. Of rodφ76, φ89,φ102,φ114
Lifting power24T
Rotation torque8500-11000N.m
Rotation Speed40-70r/min
Diesel EngineYuchai
Engine Power85Kw/2200rpm
Travelling speed0-2.5 Km/h
Climb capacity30°
Weight9000kgs
Dimension5900x2000x2850mm
ApplicationComplicated geological conditions:Rock,Mud,Sand etc.
Drilling WayTop drive hydraulic rotary and propulsion,Dth Drilling or Mud Pump Driling
Dth Hammer4",5",6",8" Drill hammer or CIR110, 130, 150,170

ST 200 Water Well Drilling Rig Advantages

1. Drill a well in 1day — which can shorten your construction period effectively.
2. Quality can prove everything–we can promise every rig we sell can be use 10+ years.
3. Our drilling rigs can drill up to 1600 meter depth.
4. Our water drilling rigs save resource effectively, it can save diesel 20-30% for you.


What should be paid attention to during the operation of the drilling rig?


a. When engaging the clutch or rotating the working wheel, it must be light, uniform and stable;

b. When changing the speed, engaging the horizontal and vertical axle boxes and changing each transfer handle, the clutch must be placed at the separation position or the work wheel must be stopped;

c. When using the lift, it is forbidden to press down the left and right handlebars at the same time;

d. After the gear oil pump is started, pay attention to the response of the oil pressure gauge and the hole bottom pressure indicator. During the drilling process, when the pressure at the hole bottom needs to be increased or decreased, it shall be adjusted gradually, and sudden increase or decrease is not allowed; When using the oil pressure system to quickly lift the vertical shaft (fast reversing rod), it is only allowed to carry out under the original load to prevent damage to the parts;



China 72kw Pneumatic Drilling Rig Commercial Industrial Rock Drilling supplier

72kw Pneumatic Drilling Rig Commercial Industrial Rock Drilling

Inquiry Cart 0