200 M Engineering Drilling Rig With Crawler Chassis In Mining Irrigation

Brand Name:JINZHOU SHITAN
Certification:ISO
Model Number:GK200
Minimum Order Quantity:1 set
Delivery Time:7-12 days
Payment Terms:L/C, D/A, D/P, T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

200m With Crawler Chassis For Multiple Usage In Mining Irrigation Engineering Drilling Rig


GK200​ Brief introduction of drilling rig


GK200​ Brief introduction of drilling rig It is suitable for core work projects in difficult terrain such as mountains, hills, rivers, and moving. It is suitable for engineering geological survey of railways, hydropower, transportation, bridges, dam foundations and other buildings; geological core drilling, physics


GK200 Hydraulic Portable 200m Water Well Drilling Machine


Drilling depth200m
Open hole diameter75-300mm
End hole diameter75mm
Active drill rod53/59*4200mm
Rod diameter50,60mm
Drill angle90°-75°
Matched power(diesel power)15kw/2200r/min
Dimension2800*950*1700mm

GK200 Engineering Drilling Rig Applications:


1. Drillings for the general exploration and investigation of solid mineral deposit, engineering geotectonic survey and concrete
structure inspection holes.
2.Diamond drill bit, alloy drill bit and steel roller drill bit and so on are available for drilling according to different
geological structures.
3.When the final holes are respectively 75mm and 46mm in diameter, the rated hole depths are separately 100m and 180m. The maximum
of depth may not exceed 110% of that drilled in each hole. The maximum allowable hole diameter is 150 mm.

Engineering Drilling Rig Features:

1.With hydraulic feeding device, elevated drilling efficiency, reduced labor strength.
2.The rig is equipped with an upper spherical jaw holding mechanism and hexagonal drive drilling rod which can be replaced without
shutdown, high efficiency, safe and reliable.
3. A hole bottom pressure gauge is mounted indicating the pressure in order to control the status inside the hole.
4.Compact structure, small volume, lightweight, high detachability, easy transportation and suitable for the operations in plains


China 200 M Engineering Drilling Rig With Crawler Chassis In Mining Irrigation supplier

200 M Engineering Drilling Rig With Crawler Chassis In Mining Irrigation

Inquiry Cart 0