

Add to Cart
400m Depth Rubber Belt Track Household Pneumatic Water Well
Drilling Rig
Introduction of crawler type Crawler Mounted Drill Rig
ST400 The drilling rig is a highly efficient and versatile drilling
rig that is mainly used to drill wells, agricultural irrigation
wells, ground heat pump wells and other wells. It is especially
suitable for water intake projects in mountainous and rock
formations.. The new hydraulic rig technology, supporting high
hydraulic torque and a large rotating hydraulic propulsion
diameter. Centralized control of the hydraulic console for easy
operation. This series of platforms uses excavator crawler chassis
for off-road performance. The independent module design allows the
platform to be easily mounted on the truck for greater
maneuverability.
Parameters of crawler type Crawler Mounted Drill Rig
Product Name | Pneumatic Drilling Rig |
Model | ST400 |
Drilling Diameter | 105-300mm |
Drilling Depth | 400m |
One-time Advance Length of the Drill | 3000/6000mm |
Walking Speed | 6km/h |
Climbing Ability | 25 |
Min. Ground Clearance | 300mm |
Working Air Pressure | 1.7-3.5Mpa |
Air Consumption | 17-35m3/min |
Main Power | 100KW/6Cylinder |
Rotation | 45-75rpm |
Rotary Torque | 9000-10000N.m |
Dimension | 6m×2m×2.5m |
Total Weight | 10T |
Operation of well drilling machine when adding drill pipe
1. When the depth of one drill pipe needs to be connected after
drilling, stop the propulsion first, then stop the rotation, and
turn off the cooling water;
2. Stop the rotation and operate the fast forward and backward
handle to the fast backward position to make the chuck quickly back
in place; 3. The gyrator reverses, at the same time, it retreats
the feed oil cylinder to rotate the water braid shaft away from the
drill pipe;
4. Operate the clamping handle to make the gripper clamp the drill
pipe and open the micro regulating flow valve (right rotation)
5. Connect the drill pipe to be added to the previous drill pipe,
and the rotator moves forward while rotating. When the trapezoidal
conical thread of the water braid shaft is in screw contact with
the conical thread of the newly added drill pipe, immediately
operate the gripper handle, loosen the gripper and complete the
drill pipe addition.
FAQ
Q 1: What kind of drilling rig do you have?
A: We mainly produce small hydraulic drilling rig, water well
drilling rig, core drilling rig, engineering drilling rig,
geological exploration drilling rig, etc., and we will recommend
the suitable model according to your exact requirement .
Q 2: Where is the address of your company?
A: Our factory is in Jinzhou, Shijiazhuang City, Hebei Province,
China
Q 3: Are you a manufacturer or a trading company?
A:We are a 20 years professional manufacturer with ISO certificate.
We have a large modern drilling rig plant in Hebei, China.
Q 4: How long is your delivery time?
A: Small hydraulic drilling rigs generally take 5-7 days, and large
pneumatic water well drilling rigs generally take 7-15 days. If
there is an urgent order, please contact our sales in advance.
Q 5: How long is the warranty of your well drilling rig?
A: Except for consumable spare parts, the whole machine shall be
one year.