GK-200 Drilling Rig Used For Drilling Water Wells And Geological Exploration

Brand Name:JINZHOU SHITAN
Certification:iso
Model Number:GK-200
Minimum Order Quantity:1
Delivery Time:7-10 days
Payment Terms:D/A, D/P, Western Union, T/T, MoneyGram, L/C
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Industrial Zone, Jinzhou City, Hebei Province, China
Supplier`s last login times: within 28 hours
Product Details Company Profile
Product Details

GK-200 Drilling Rig Used For Drilling Water Wells And Geological Exploration


GK200 Introduction to drilling rig


GK-200 is widely used for Water well drilling, Geological Exploration and Prospecting, Geothermal wells, Blast-hole, Irrigation projects, etc.


GK200 Drilling rig parameters


GK-200 Type
DrillSwivel Head

Drilling depth


Max.200m

Spindle speed


(4-speed)

115 230 505 1010r/m

Hole diameter


Max.300mmSpindle stroke450kmm
Drill rod diameter50mmSpindle pull-downMax.15KN
Angle range90-75Spindle lifting capacityMax. 25KN
Oil pumpWater pump
ModelYBC-20/125ModelHorizontal reciprocating single-acting piston pump
Rated pressure12.5MpaWorking pressureMax. 1.2Mpa
Flow speed20ml/r
Rated speed2000r/min
HoistPower(diesel)
Max. lifting capacity15KNModel(diesel engine)1115
Hoisting drum revolution20.39.85.170r/mRated power20KW
Drum diameter140mmRated speed2200r/m
WEIGHTAROUND 980KG
SIZE1433x697x1273mm

GK200 Core Hydraulic Water Well Drilling Rig


1. Keeping bracket is installed on the hosit to form a double wheel support structure, able to withstand strong blow

2. Vertical box are fixed by four groups of bearings to ensure that the rotary machine has sufficient rigidity to overcome gravel layer and other complex geological conditions.

3. the machine is equipped with national patent technology---taper clutch, with charactristics of strong transmission troque, easy operation and free maintenance.

4. 53 x 59 drilling rod adopted, high rigidity and strong delivery torque.


What should be paid attention to during the operation of the drilling rig?


a. When engaging the clutch or rotating the working wheel, it must be light, uniform and stable;

b. When changing the speed, engaging the horizontal and vertical axle boxes and changing each transfer handle, the clutch must be placed in the disengaged position or the working wheel must be stopped;

c. When using the lift, it is forbidden to press down the left and right handlebars at the same time;

d. After the gear oil pump starts, pay attention to the reaction of the oil pressure gauge and the hole bottom pressure indicator. In the process of drilling, when the pressure at the bottom of the hole needs to be increased or decreased, it should be adjusted gradually, and sudden increase or decrease is not allowed; When using the oil pressure system to quickly lift the vertical shaft (fast reversing rod), it is only allowed to carry out under the original load to prevent damage to the parts;

e. Before moving the XY drill, loosen the locking mechanism, wipe the guide rail clean and apply lubricating oil; It must be locked after moving;

f. Pay attention to the impact sound of all parts of the machine at any time; Whether the gearbox, bearing, shaft sleeve, horizontal and vertical shaft gearbox, etc. exceed the hot hand temperature (60 ℃), if so, it should be eliminated; g. All oil pressure control handles shall not be used at the same time;



China GK-200 Drilling Rig  Used For Drilling Water Wells And Geological Exploration supplier

GK-200 Drilling Rig Used For Drilling Water Wells And Geological Exploration

Inquiry Cart 0