Home /

BW 160 High Precision Drilling Mud Pump For Borehole Drilling

BW 160 High Precision Drilling Mud Pump For Borehole Drilling

Brand Name:JINZHOU SHITAN
Certification:ISO
Model Number:BW-160
Minimum Order Quantity:Negotiation
Delivery Time:7-10 days
Payment Terms:T/T, Western Union
Contact Now

Add to Cart

Verified Supplier
Location: Jinzhou Hebei China
Address: Xiaoshang Village, Yingli Town, Jinzhou City, Hebei Province, China
Supplier`s last login times: within 28 hours
Shipping
lt's easy to get a shipping quote! Just click the button below and complete the short form.
Get Shipping Quote
Product Details Company Profile
Product Details

BW 160 High Precision Drilling Mud Pump For Borehole Drilling


Product Description:


A mud pump (sometimes referred to as a mud drilling pump or drilling mud pump), is a reciprocating piston/plunger pump designed to circulate drilling fluid under high pressure (up to 7,500 psi (52,000 kPa)) down the drill string and back up the annulus. A mud pump is an important part of the equipment used for oil well drilling

Mud pumps can be divided into single-acting pump and double-acting pump according to the completion times of the suction and drainage acting in one cycle of the piston's reciprocating motion.


Product Parameter:


TypeHorizontal type single-cylinder Double-action pump
Cylinder Diameter95 mm
Stroke85 mm
Reciprocate Times165 times/ minute
Displacement160 L/min
Pressure1.3 MPa
Volume Effiency80%
Input Speed951 rotations/min
Transmisiion shaft speedD180/Z5.88kw
Input pipe diameter50mm
Output pipe diameter40mm
Mass (including the engine)200 kg
Dimensions1110*725*965 mm

Product Main Features


BW-160 mud pump is a portable mud pump. The pump is a horizontal three-cylinder reciprocating single-acting piston pump with four flows and four pressures. The flow and pressure vary widely. The pump has the characteristics of small volume, light weight, long service life, simple operation, flexibility and reliability, and many general and standard parts, which are light and flexible, and easy to move. It can be used for geological exploration and engineering exploration in railway, water, metallurgy, construction, geology and other industries with hole depth less than 1000m


Why is the water well drilling rig not suitable for use in rainy days?


After the well is completed, it is necessary to pump water to check the results. Under normal circumstances, a large draw down pumping can be done. The stable duration of the water level shall not be less than eight hours, and the water flow of the dynamic water level of the well shall be measured at the same time. The well drilling project shall ensure the smooth drainage of the construction site, so the rainy season shall be avoided. When working while excavating, the excavation slope shall be determined according to the physical and mechanical properties of the soil layer, generally 1:1.5, and there shall be a certain distance from the toe of the spoil slope to the upper opening of the excavation. For large wells with water inflow from the shaft wall, the water inlet hole and inverted filter layer of the shaft wall must be arranged according to the design requirements, and the water inlet hole shall be prevented from being blocked during construction. The filter material enclosure at the aquifer shall meet the requirements, the backfill shall have a certain super elevation, and the frozen soil in the backfill in winter shall not exceed 15%.



China BW 160 High Precision Drilling Mud Pump For Borehole Drilling supplier

BW 160 High Precision Drilling Mud Pump For Borehole Drilling

Inquiry Cart 0