European Designation Fully Automatic Interchangeable Cz Purlin Machine

Brand Name:Lebron-Machinery
Certification:ISO 9001: 2008
Model Number:C80-300
Minimum Order Quantity:1 Set
Delivery Time:35 days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Wuxi Jiangsu China
Address: 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China
Supplier`s last login times: within 25 hours
Product Details Company Profile
Product Details

European Designation Fully Automatic Interchangeable C Z Purlin Roll Forming Machine


1. Description of CZ purlin roll forming machine


1). Machine feature:


a). Change size by PLC system. Interchangeable between C purlin and Z purlin by manual. It will take 5~10 minutes to finish.

b). Easy operation, low maintenance cost

c). Infinite sizing (any sizes with machine range), help to save materials

d). Optional punch hole at any position of purlin web size and flange size


2). Electric Appliances

a). Frequency converter: YASKAWA Brand

b). Computer PLC: SIEMENS Brand

c). Touch Screen: MCGS Brand

d). Low Voltage Apparatus: SCHNEIDER Brand

e). Encoder: OMRON Brand


2. Technical Parameters of CZ Purlin Roll Forming Machine


No.ItemDescription
1Main Power18.5 KW
2Drive ModelChain
3Machine FrameThe machine frame and structural parts are made of national standard 350H steel, reduce the stress after welding
4Roller MaterialNo.45 Steel, Finishing-machining. Coated with hard chrome, Chrome thickness: 0.05mm. Quench heat-treatment
5Roller ShaftsNo.45 Steel. Finishing-machining. Diameter: φ80 mm
6Cutter BladeCr12MoV steel. Finishing-machining. Quenched heat-treatment. HRC 58-62 degrees. Wire-electrode Cutting. Finish-grinding
7Roller Station20 Stations
8Roll Forming Speed15~20m/min
9Suitable MaterialGalvanized Steel Coil, Cold Rolled Coil
10Suitable Thickness1.5-3.0mm
11Out-put LengthControlled by PLC and according to user’s demand
12Structure DesignThe width changing by PLC control.
13Machine SizeAbout 8.0m*1.5m*1.0m
14Machine WeightAround 12 Tons

3. FAQ:


1. Q: Are you a manufacturer?

A: Yes, we are a manufacture with over 11 years of experience.


2. Q: If I am new in this field. How could I understand the machine very well?

A: We have a very professional sales team and technology team. We will provide you the detailed introductions by photos, videos, and technical proposals. If you have any questions, we can reply to you in the shortest time.


3. Q: I have no Whatsapp and Skype, how could I contact with you

A: Send one email to me (alfred@lebron-machinery.com). Leave your contact information for me. I will contact you. It is free.


4. Q: How should I do if I would like to order my machine

A: Send us your design drawing if you have any. Or tell us your design idea. we arrange for our engineers to make the drawing for your confirmation at first. After every technical detail confirmed, meantime, we reach an agreement on the price, delivery time, after-sales service, etc. We can sign a contract then


5. Q: Can you use other brands of spare parts for me if I want.

A: Yes. We can.


4. Our Advantages


1). We are a factory with over 10 years experiences in manufacturing Roll Forming Machines;

2). We have our own powerful research and development team

3). We have more than 15 technicians.

4). 5 engineers with more than 20 years of experience

5). We have an advanced Laser Cutting Machine, CNC Machining Center, Polishing Line, Painting Line, etc. These advanced production equipment guarantee that the good quality of each part and the appearance of our machines;

6). Our machines have reached the International Inspection Standards;


5. Our Service


After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.


The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.


The buyer should arrange the accommodation, food, and traffic in the destination


Training period: 2 days. (we can supply training on the operation spot if buyer needs)


Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.







China European Designation Fully Automatic Interchangeable Cz Purlin Machine supplier

European Designation Fully Automatic Interchangeable Cz Purlin Machine

Inquiry Cart 0