H1.2m Light Gauge Steel Framing System , 11KW Rain Gutter Roll Forming Machine

Brand Name:Lebron-Machinery
Certification:ISO 9001: 2008
Model Number:YX108-203
Minimum Order Quantity:1 Set
Delivery Time:30 Days
Payment Terms:L/C, T/T
Contact Now

Add to Cart

Active Member
Location: Wuxi Jiangsu China
Address: 1604#, Yangming Sicence & Technology Industry Center, No.855 Nanhu Avenue,Wuxi city, Jiangsu, China
Supplier`s last login times: within 25 hours
Product Details Company Profile
Product Details

Light Gauge Steel Framing System Steel Gutter Roll Forming Machine Simens PLC Control


1. Description of steel gutter roll forming machine:


Steel gutter roll forming machine is used for the production of the metal gutters, which are widely used in modern villas and multiple raises buildings. LBM is producing high-quality steel gutter roll forming machines and exports them to India, Vietnam, Indonesia, Thailand, Egypt, etc.


2. Main parameter of steel gutter roll forming machine


No.Main Technical Parameters
1Suitable Raw MaterialGI, GL, PPGI, PPGL Coil
2Width200-600mm
3Thickness0.4-0.6mm
4Roller station24 stations
5DimensionsApprox 8.6*0.8*1.2m
6Main Power11kw
7Forming speed12~15m/min
8Diameter of the shaft75mm
9WeightAbout 6.0 T
10Voltage380V 50Hz 3phases
11Rolling materialNo. 45# with hard chrome and quenched
12Material of the cutting plateCr12 Steel
13Control systemPLC control

3. Our advantages:


Our factory has more than 10 years of working experience in researching and selling. Products are well sailed all over the world, got many compliments from customers.


1). Germany COPRA software design

2). 5 engineers with more than 20 years of experience

3). 15 professional technician

4). 11 sets advanced CNC production lines on site

5). Passionate Team

6). Installation engineers can reach your factory within 6 days

7). 2 years maintenance and whole life technical support


4. Our Service


Installation service


a. After the machine arrives at the destination, the seller will send the technician to the buyer’s factory to install the machine if the buyer wants. The buyer needs to provide some technicians to assist in the installation work.


The installation period is around 5 days. The buyer should have been prepared for the steel sheet, foundation position the machine before the seller’s technician's departure.


The buyer should arrange the accommodation, food, and traffic in the destination


Training period: 2 days. (we can supply training on the operation spot if buyer needs)


Within 3 months after the arrival of the goods at the port of destination, if there is no installment requirement from the Buyers, the goods should be counted as up to standard. The inspection standard is based on the technical standard signed by both parties and our company standard.


5. FAQ:


1. Q: Are you a manufacturer, trading company?

A: We are a manufacturer, and we have built up our company since 2007.


2. Q: Where is your factory located?

A: Our factory address is: No. 551, the Zhenze West Road, Huazhuang Street, Binhu District, Wuxi City, Jiangsu, China


3. Q: How can I get to your factory?

A: Our factory is near Shanghai Airport, we can pick you up at the airport. Or you can by plane direct to Wuxi airport. We can pick you up.


4. Q: If I will need to stay in your place for a few days, is that possible to book the hotel for me?

A: It’s always my pleasure, a hotel booking service is available.




China H1.2m Light Gauge Steel Framing System , 11KW Rain Gutter Roll Forming Machine supplier

H1.2m Light Gauge Steel Framing System , 11KW Rain Gutter Roll Forming Machine

Inquiry Cart 0